Skip to main content
RateWatt

Wind power plant, Arizona

Chevelon Butte Wind Farm, Arizona

Chevelon Butte Wind Farm is a 238 MW wind power plant in Coconino County, Arizona, operated by AES Clean Energy, and it generated 624,169 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Arizona, and its capacity factor sits at the 38th percentile of U.S. wind plants. By 2025 generation it ranks 1,094th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

238 MWNameplate capacity
30%Capacity factor, 2025, 38th percentile, on 238 MW net summer
0.5%Of AZ generation, 2025
2 yearsAverage generator age, by MW

How hard does the Chevelon Butte Wind Farm plant run compared with other wind plants?

The Chevelon Butte Wind Farm plant had a capacity factor of 30% in 2025 on 238 MW of net summer capacity, the 38th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 109 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Chevelon Butte Wind Farm30%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Chevelon Butte Wind Farm plant generating more or less than last year?

Generation at Chevelon Butte Wind Farm rose 9.0% from 2024 to 2025, from 572,573 MWh to 624,169 MWh. Through August 2026 it is running 10.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024572,573
2025624,169
2026 through August421,583
2025, same months472,545
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202643,264
July 202645,545
June 202679,355
May 202668,298
April 202669,810
March 202650,289
February 202636,973
January 202628,049
December 202534,669
November 202527,556
October 202543,618
September 202545,781
August 202552,029
July 202562,650
June 202559,512
May 202559,751
April 202558,107
March 202573,379
February 202560,771
January 202546,346
December 202432,474
November 202445,485
October 202436,804
September 202442,345
August 202438,967
July 202448,914
June 202462,324
May 202468,644
April 202457,892
March 202459,575
February 202456,511
January 202422,638

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Chevelon Butte Wind Farm plant?

Chevelon Butte Wind Farm made 0.5% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.6% of the state's 40,514 MW of capacity. By capacity it is the 44th largest of 191 plants in Arizona, the 1,337th largest of 14,327 in the U.S. and the 168th largest of 1,358 wind plants. By 2025 generation it is the 30th largest of 167 generating plants in the state.

Chevelon Butte Wind Farm within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)23840,5140.6%
Generation (MWh)624,169115,800,3780.5%
Wind capacity (MW)2381,20519.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Chevelon Butte Wind Farm plant, and when do they retire?

1 operable generator totals 238 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1238100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CHVBOperatingOnshore Wind Turbine2382023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Chevelon Butte Wind Farm plant?

EIA lists no joint owners for Chevelon Butte Wind Farm. AES Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Chevelon Butte Wind Farm plant?

Chevelon Butte Wind Farm is in Winslow, Coconino County, Arizona, at 34.6815° N, 110.8017° W. It sits in the Arizona Public Service Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Arizona are similar in size?

Arizona has 8 operable wind plants with 1,205 MW of capacity, and Chevelon Butte Wind Farm's 238 MW is 20% of that.

Wind plants in Arizona around this size
PlantCountyMW2025 MWh
Mohave County Wind FarmMohave350997,150
Chevelon Butte Wind FarmCoconino238624,169
Chevelon Butte Phase 2Coconino216525,472
Babbitt Ranch Energy CenterCoconino163552,206

Source: EIA Forms EIA-860 and EIA-923, 2025.