Natural gas power plant, Massachusetts
Cleary Flood Hybrid natural gas power plant, Massachusetts
Cleary Flood Hybrid is a 121 MW power plant, 118 MW of it natural gas, in Bristol County, Massachusetts, operated by City of Taunton-(MA), and it generated 54,191 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Massachusetts, and its capacity factor sits at the 25th percentile of U.S. natural gas plants. By 2025 generation it ranks 3,994th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Cleary Flood Hybrid plant run compared with other natural gas plants?
The Cleary Flood Hybrid plant's natural gas units had a capacity factor of 6% in 2025 on 103 MW of net summer capacity, the 25th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 21 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Cleary Flood Hybrid | 6% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.
Is the Cleary Flood Hybrid plant generating more or less than last year?
Cleary Flood Hybrid generated 54,191 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 9 months, so the two years are not compared.
5 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 132,522 |
| 2025 | 54,191 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 5,037 |
| November 2025 | 8,796 |
| October 2025 | 7,443 |
| September 2025 | 1,470 |
| August 2025 | 3,051 |
| July 2025 | 8,643 |
| June 2025 | 6,930 |
| May 2025 | 6,910 |
| April 2025 | 5,085 |
| March 2025 | -10 |
| February 2025 | -15 |
| January 2025 | 851 |
| December 2024 | 1,128 |
| November 2024 | 6,207 |
| October 2024 | 28,553 |
| September 2024 | 19,800 |
| August 2024 | 22,992 |
| July 2024 | 25,774 |
| June 2024 | 9,044 |
| May 2024 | 11,760 |
| April 2024 | 7,311 |
| March 2024 | -17 |
| February 2024 | -12 |
| January 2024 | -18 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Cleary Flood Hybrid plant, and when do they retire?
3 operable generators total 121 MW, with an average age of 49 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 28.3 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1970s | 2 | 118 | 98% | none reported |
| 2020s | 1 | 3 | 2% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CA9 | Operating | Natural Gas Fired Combined Cycle | 95 | 1975 | n/a |
| 9A | Operating | Natural Gas Fired Combined Cycle | 23 | 1976 | n/a |
| BS1 | Operating | Batteries | 3 | 2020 | n/a |
| 8 | Retired | Petroleum Liquids | 28 | 1966 | 2020 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Cleary Flood Hybrid plant?
3 owners report shares in Cleary Flood Hybrid; City of Taunton-(MA) holds the largest named share, 84.2% or about 102 MW. City of Taunton-(MA) operates the plant. The listed shares add up to 97.5% of capacity; generators without joint owners are not on this list.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| City of Taunton-(MA) | 84.2% | 102 | 45,645 |
| Town of North Attleborough-(MA) | 8.9% | 11 | 4,801 |
| Town of Hudson-(MA) | 4.4% | 5 | 2,401 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
What does City of Taunton charge homes?
City of Taunton, the operator of Cleary Flood Hybrid, had an average residential price of 18.81¢ per kWh and an average bill of $130 a month in 2025, 38% below the Massachusetts average of 30.41¢.
| Measure | Price | Monthly bill | Against Massachusetts |
|---|---|---|---|
| City of Taunton | 18.81¢ | $130 | 38% lower |
| Massachusetts average | 30.41¢ | $181 | |
| U.S. average | 17.23¢ | $151 | 43% lower |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
What fuels does the Cleary Flood Hybrid plant use?
Cleary Flood Hybrid has capacity on 2 fuels: 98% natural gas and 2% battery and pumped storage. In 2025, natural gas made 94% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Natural gas | 118 | 97.5% | 51,058 |
| Battery and pumped storage | 3 | 2.5% | -125 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Cleary Flood Hybrid plant?
Cleary Flood Hybrid is in Taunton, Bristol County, Massachusetts, at 41.8653° N, 71.1061° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Massachusetts are similar in size?
Massachusetts has 40 operable natural gas plants with 5,978 MW of capacity, and Cleary Flood Hybrid's 118 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Kendall Square Station | Middlesex | 213 | 1,521,096 |
| Dighton Power Plant | Bristol | 200 | 275,532 |
| Pittsfield Generating LP | Berkshire | 176 | 132,812 |
| Cleary Flood Hybrid | Bristol | 118 | 51,058 |
| Potter Station 2 | Norfolk | 116 | 25,091 |
| Dartmouth Power Associates LP | Bristol | 97 | 86,027 |
| MMWEC Simple Cycle Gas Turbine | Essex | 65 | 2,575 |
Source: EIA Forms EIA-860 and EIA-923, 2025.