Natural gas power plant, Massachusetts
MMWEC Simple Cycle Gas Turbine natural gas power plant, Massachusetts
MMWEC Simple Cycle Gas Turbine is a 65 MW natural gas power plant in Essex County, Massachusetts, operated by Massachusetts Mun Wholes Electric Co, and it generated 8,314 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 5th percentile of U.S. natural gas plants. By 2025 generation it ranks 6,678th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the MMWEC Simple Cycle Gas Turbine plant run compared with other natural gas plants?
The MMWEC Simple Cycle Gas Turbine plant had a capacity factor of under 1% in 2025 on 63 MW of net summer capacity, the 5th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. It ran for only a few hours of the year at full output.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| MMWEC Simple Cycle Gas Turbine | under 1% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the MMWEC Simple Cycle Gas Turbine plant generating more or less than last year?
MMWEC Simple Cycle Gas Turbine generated 8,314 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | 0 |
| 2025 | 8,314 |
Monthly generation, Jul 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,792 |
| November 2025 | 385 |
| October 2025 | 371 |
| September 2025 | 245 |
| August 2025 | 441 |
| July 2025 | 490 |
| June 2025 | 412 |
| May 2025 | 242 |
| April 2025 | 242 |
| March 2025 | 293 |
| February 2025 | 713 |
| January 2025 | 2,688 |
| December 2024 | 0 |
| November 2024 | 0 |
| October 2024 | 0 |
| September 2024 | 0 |
| August 2024 | 0 |
| July 2024 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the MMWEC Simple Cycle Gas Turbine plant, and when do they retire?
1 operable generator totals 65 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 65 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GT1 | Operating | Natural Gas Fired Combustion Turbine | 65 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the MMWEC Simple Cycle Gas Turbine plant?
EIA lists no joint owners for MMWEC Simple Cycle Gas Turbine. Massachusetts Mun Wholes Electric Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the MMWEC Simple Cycle Gas Turbine plant?
MMWEC Simple Cycle Gas Turbine is in Peabody, Essex County, Massachusetts, at 42.5434° N, 70.9280° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Massachusetts are similar in size?
Massachusetts has 40 operable natural gas plants with 5,978 MW of capacity, and MMWEC Simple Cycle Gas Turbine's 65 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Cleary Flood Hybrid | Bristol | 118 | 51,058 |
| Potter Station 2 | Norfolk | 116 | 25,091 |
| Dartmouth Power Associates LP | Bristol | 97 | 86,027 |
| MMWEC Simple Cycle Gas Turbine | Essex | 65 | 2,575 |
| Waters River | Essex | 65 | 3,934 |
| Medical Area Total Energy Plant | Suffolk | 61 | 310,662 |
| Mass Inst Tech Cntrl Utilities/Cogen Plt | Middlesex | 43 | 209,366 |
Source: EIA Forms EIA-860 and EIA-923, 2025.