Natural gas power plant, Massachusetts
Potter Station 2 natural gas power plant, Massachusetts
Potter Station 2 is a 116 MW natural gas power plant in Norfolk County, Massachusetts, operated by Town of Braintree-(MA), and it generated 40,994 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Massachusetts, and its capacity factor sits at the 17th percentile of U.S. natural gas plants. By 2025 generation it ranks 4,331st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Potter Station 2 plant run compared with other natural gas plants?
The Potter Station 2 plant had a capacity factor of 3% in 2025 on 105 MW of net summer capacity, the 17th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 10 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Potter Station 2 | 3% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Potter Station 2 plant generating more or less than last year?
Generation at Potter Station 2 rose 75.7% from 2024 to 2025, from 23,330 MWh to 40,994 MWh.
| Period | MWh |
|---|---|
| 2024 | 23,330 |
| 2025 | 40,994 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 7,037 |
| November 2025 | 2,983 |
| October 2025 | 2,920 |
| September 2025 | 1,876 |
| August 2025 | 4,891 |
| July 2025 | 6,683 |
| June 2025 | 5,351 |
| May 2025 | 804 |
| April 2025 | 768 |
| March 2025 | 1,047 |
| February 2025 | 2,961 |
| January 2025 | 3,674 |
| December 2024 | 3,656 |
| November 2024 | 1,515 |
| October 2024 | 3,674 |
| September 2024 | 1,032 |
| August 2024 | 2,511 |
| July 2024 | 4,709 |
| June 2024 | 1,090 |
| May 2024 | 532 |
| April 2024 | 1,626 |
| March 2024 | 1,405 |
| February 2024 | 376 |
| January 2024 | 1,205 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Potter Station 2 plant, and when do they retire?
2 operable generators total 116 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 4 have already retired, totalling 106 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 2 | 116 | 100% | none reported |
Every generator, 6 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WAT1 | Operating | Natural Gas Fired Combustion Turbine | 58 | 2009 | n/a |
| WAT2 | Operating | Natural Gas Fired Combustion Turbine | 58 | 2009 | n/a |
| IC1 | Retired | Petroleum Liquids | 3 | 1963 | 2014 |
| IC2 | Retired | Petroleum Liquids | 3 | 1963 | 2007 |
| CC2 | Retired | Natural Gas Fired Combined Cycle | 76 | 1977 | 2024 |
| CC3 | Retired | Natural Gas Fired Combined Cycle | 25 | 1977 | 2024 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Potter Station 2 plant?
EIA lists no joint owners for Potter Station 2. Town of Braintree-(MA) operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Town of Braintree charge homes?
Town of Braintree, the operator of Potter Station 2, had an average residential price of 16.16¢ per kWh and an average bill of $117 a month in 2025, 47% below the Massachusetts average of 30.41¢.
| Measure | Price | Monthly bill | Against Massachusetts |
|---|---|---|---|
| Town of Braintree | 16.16¢ | $117 | 47% lower |
| Massachusetts average | 30.41¢ | $181 | |
| U.S. average | 17.23¢ | $151 | 43% lower |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Potter Station 2 plant?
Potter Station 2 is in Braintree, Norfolk County, Massachusetts, at 42.2350° N, 70.9672° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Massachusetts are similar in size?
Massachusetts has 40 operable natural gas plants with 5,978 MW of capacity, and Potter Station 2's 116 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Dighton Power Plant | Bristol | 200 | 275,532 |
| Pittsfield Generating LP | Berkshire | 176 | 132,812 |
| Cleary Flood Hybrid | Bristol | 118 | 51,058 |
| Potter Station 2 | Norfolk | 116 | 25,091 |
| Dartmouth Power Associates LP | Bristol | 97 | 86,027 |
| MMWEC Simple Cycle Gas Turbine | Essex | 65 | 2,575 |
| Waters River | Essex | 65 | 3,934 |
Source: EIA Forms EIA-860 and EIA-923, 2025.