Skip to main content
RateWatt

Natural gas power plant, Massachusetts

Waters River natural gas power plant, Massachusetts

Waters River is a 64.9 MW natural gas power plant in Essex County, Massachusetts, operated by City of Peabody-(MA), and it generated 5,521 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 9th percentile of U.S. natural gas plants. By 2025 generation it ranks 7,897th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

64.9 MWNameplate capacity
under 1%Capacity factor, 2025, 9th percentile, on 46 MW net summer
7,897thU.S. rank by generation, 2025
41 yearsAverage generator age, by MW

How hard does the Waters River plant run compared with other natural gas plants?

The Waters River plant had a capacity factor of under 1% in 2025 on 46 MW of net summer capacity, the 9th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Waters Riverunder 1%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Waters River plant generating more or less than last year?

Waters River generated 5,521 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 10 months, so the two years are not compared.

Net generation by period
PeriodMWh
20244,584
20255,521
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20250
November 2025145
October 2025530
September 2025282
August 2025801
July 20251,024
June 20252,128
May 20250
April 2025108
March 20258
February 2025259
January 2025236
December 20240
November 2024289
October 2024604
September 202451
August 20241,022
July 20241,726
June 2024811
May 20240
April 202462
March 20247
February 20247
January 20246

Source: EIA Form EIA-923, through August 2026.

How much of Massachusetts' electricity comes from the Waters River plant?

Waters River made 0.0% of the 22,344,120 MWh reported by Massachusetts plants in 2025, from 0.5% of the state's 12,992 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 28th largest of 686 plants in Massachusetts, the 3,448th largest of 14,327 in the U.S. and the 1,006th largest of 1,962 natural gas plants. By 2025 generation it is the 198th largest of 647 generating plants in the state.

Waters River within Massachusetts, 2025
MeasureThis plantMassachusettsShare
Capacity (MW)6512,9920.5%
Generation (MWh)5,52122,344,1200.0%
Natural gas capacity (MW)655,9781.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Waters River plant, and when do they retire?

2 operable generators total 64.9 MW, with an average age of 41 years weighted by capacity at the end of 2025. 21.3 MW, 33% of operable capacity, has a planned retirement, the first in 2026.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s12133%2026
1990s14467%none reported
Capacity retiring by year
YearUnitsMW retiringShare of plant
202612133%
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNatural Gas Fired Combustion Turbine2119712026
2OperatingNatural Gas Fired Combustion Turbine441990n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Waters River plant?

EIA lists no joint owners for Waters River. City of Peabody-(MA) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Peabody charge homes?

City of Peabody, the operator of Waters River, had an average residential price of 16.88¢ per kWh and an average bill of $121 a month in 2025, 44% below the Massachusetts average of 30.41¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Massachusetts
City of Peabody16.88¢$12144% lower
Massachusetts average30.41¢$181
U.S. average17.23¢$15143% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Waters River plant?

Waters River is in Peabody, Essex County, Massachusetts, at 42.5429° N, 70.9283° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Massachusetts are similar in size?

Massachusetts has 40 operable natural gas plants with 5,978 MW of capacity, and Waters River's 64.9 MW is 1% of that.

Natural gas plants in Massachusetts around this size
PlantCountyMW2025 MWh
Potter Station 2Norfolk11625,091
Dartmouth Power Associates LPBristol9786,027
MMWEC Simple Cycle Gas TurbineEssex652,575
Waters RiverEssex653,934
Medical Area Total Energy PlantSuffolk61310,662
Mass Inst Tech Cntrl Utilities/Cogen PltMiddlesex43209,366

Source: EIA Forms EIA-860 and EIA-923, 2025.