Solar power plant, Pennsylvania

Cobalt Solar, LLC power plant, Pennsylvania

Cobalt Solar, LLC is a 20 MW solar power plant in Forest County, Pennsylvania, operated by Cypress Creek Renewables, and it generated 18,905 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 7th percentile of U.S. solar plants. By 2025 generation it ranks 5,317th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
11%Capacity factor, 2025, 7th percentile, on 20 MW net summer
5,317thU.S. rank by generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Cobalt Solar, LLC plant run compared with other solar plants?

The Cobalt Solar, LLC plant had a capacity factor of 11% in 2025 on 20 MW of net summer capacity, the 7th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 39 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cobalt Solar, LLC11%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Cobalt Solar, LLC plant generating more or less than last year?

Cobalt Solar, LLC generated 18,905 MWh in 2025; EIA reports no 2024 total to compare.

Net generation by period
PeriodMWh
2024n/a
202518,905
Monthly generation, Jan 2025 to Dec 2025
MonthMWh
December 2025913
November 20251,026
October 20252,642
September 20252,961
August 20254,192
July 20253,606
June 20253,565
May 20250
April 20250
March 20250
February 20250
January 20250

Source: EIA Form EIA-923, through August 2026.

How much of Pennsylvania's electricity comes from the Cobalt Solar, LLC plant?

Cobalt Solar, LLC made 0.0% of the 245,706,645 MWh reported by Pennsylvania plants in 2025, from 0.0% of the state's 53,097 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 134th largest of 273 plants in Pennsylvania, the 4,775th largest of 14,327 in the U.S. and the 1,271st largest of 7,223 solar plants. By 2025 generation it is the 157th largest of 253 generating plants in the state.

Cobalt Solar, LLC within Pennsylvania, 2025
MeasureThis plantPennsylvaniaShare
Capacity (MW)2053,0970.0%
Generation (MWh)18,905245,706,6450.0%
Solar capacity (MW)201,1311.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Cobalt Solar, LLC plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
COBALOperatingSolar Photovoltaic202025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Cobalt Solar, LLC plant?

EIA lists no joint owners for Cobalt Solar, LLC. Cypress Creek Renewables operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Cobalt Solar, LLC plant?

Cobalt Solar, LLC is in Washington Township, Forest County, Pennsylvania, at 41.3991° N, 79.3959° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Pennsylvania are similar in size?

Pennsylvania has 74 operable solar plants with 1,131 MW of capacity, and Cobalt Solar, LLC's 20 MW is 2% of that.

Solar plants in Pennsylvania around this size
PlantCountyMW2025 MWh
Cottontail Solar 8York2035,800
Gaucho SolarBeaver2031,966
Lyons SolarBerks2034,933
Cobalt Solar, LLCForest2018,905
Erie Solar, LLCErie2023,277
Cardinal Solar, LLCVenango208,097
Blairs Valley Solar ProjectFranklin2010,261

Source: EIA Forms EIA-860 and EIA-923, 2025.