Erie Solar, LLC is a 20 MW solar power plant in Erie County, Pennsylvania, operated by Erie Solar, LLC, and it generated 23,277 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 9th percentile of U.S. solar plants. By 2025 generation it ranks 5,056th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Erie Solar, LLC plant run compared with other solar plants?
The Erie Solar, LLC plant had a capacity factor of 13% in 2025 on 20 MW of net summer capacity, the 9th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 48 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Erie Solar, LLC | 13% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Erie Solar, LLC plant generating more or less than last year?
Erie Solar, LLC generated 23,277 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 23,277 |
Monthly generation, Jan 2025 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 664 |
| November 2025 | 685 |
| October 2025 | 2,640 |
| September 2025 | 3,457 |
| August 2025 | 3,619 |
| July 2025 | 1,972 |
| June 2025 | 3,904 |
| May 2025 | 3,790 |
| April 2025 | 2,546 |
| March 2025 | 0 |
| February 2025 | 0 |
| January 2025 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Erie Solar, LLC plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ERIE | Operating | Solar Photovoltaic | 20 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Erie Solar, LLC plant?
EIA lists no joint owners for Erie Solar, LLC. Erie Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Erie Solar, LLC plant?
Erie Solar, LLC is in Girard, Erie County, Pennsylvania, at 42.0131° N, 80.3073° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Pennsylvania are similar in size?
Pennsylvania has 74 operable solar plants with 1,131 MW of capacity, and Erie Solar, LLC's 20 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Gaucho Solar | Beaver | 20 | 31,966 |
| Lyons Solar | Berks | 20 | 34,933 |
| Cobalt Solar, LLC | Forest | 20 | 18,905 |
| Erie Solar, LLC | Erie | 20 | 23,277 |
| Cardinal Solar, LLC | Venango | 20 | 8,097 |
| Blairs Valley Solar Project | Franklin | 20 | 10,261 |
| Pine 1 Solar | Beaver | 17 | 28,541 |