Wind power plant, Oregon
Condon Windpower LLC wind power plant, Oregon
Condon Windpower LLC is a 49.8 MW wind power plant in Gilliam County, Oregon, operated by ALLETE Clean Energy, and it generated 73,221 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Oregon, and its capacity factor sits at the 6th percentile of U.S. wind plants. By 2025 generation it ranks 3,728th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Condon Windpower LLC plant run compared with other wind plants?
The Condon Windpower LLC plant had a capacity factor of 17% in 2025 on 49.8 MW of net summer capacity, the 6th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 61 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Condon Windpower LLC | 17% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Condon Windpower LLC plant generating more or less than last year?
Generation at Condon Windpower LLC fell 4.9% from 2024 to 2025, from 76,991 MWh to 73,221 MWh.
| Period | MWh |
|---|---|
| 2024 | 76,991 |
| 2025 | 73,221 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 12,089 |
| November 2025 | 5,316 |
| October 2025 | 5,939 |
| September 2025 | 3,098 |
| August 2025 | 3,978 |
| July 2025 | 4,695 |
| June 2025 | 5,037 |
| May 2025 | 6,314 |
| April 2025 | 6,208 |
| March 2025 | 9,411 |
| February 2025 | 6,462 |
| January 2025 | 4,674 |
| December 2024 | 5,365 |
| November 2024 | 9,107 |
| October 2024 | 6,240 |
| September 2024 | 3,955 |
| August 2024 | 4,942 |
| July 2024 | 4,648 |
| June 2024 | 6,461 |
| May 2024 | 8,829 |
| April 2024 | 5,883 |
| March 2024 | 8,489 |
| February 2024 | 4,848 |
| January 2024 | 8,224 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Condon Windpower LLC plant, and when do they retire?
2 operable generators total 49.8 MW, with an average age of 23 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 2 | 50 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Onshore Wind Turbine | 25 | 2001 | n/a |
| GEN2 | Operating | Onshore Wind Turbine | 25 | 2002 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Condon Windpower LLC plant?
EIA lists no joint owners for Condon Windpower LLC. ALLETE Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Condon Windpower LLC plant?
Condon Windpower LLC is in Condon, Gilliam County, Oregon, at 45.2766° N, 120.2794° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Oregon are similar in size?
Oregon has 50 operable wind plants with 4,181 MW of capacity, and Condon Windpower LLC's 49.8 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Klondike Windpower II | Sherman | 75 | 235,838 |
| Willow Creek Energy Center | Morrow | 72 | 157,702 |
| Eurus Combine Hills Turbine Ranch 2 | Umatilla | 66 | 136,983 |
| Condon Windpower LLC | Gilliam | 50 | 73,221 |
| Combine Hills I | Umatilla | 43 | 61,244 |
| Vansycle | Umatilla | 25 | 54,901 |
Source: EIA Forms EIA-860 and EIA-923, 2025.