Eurus Combine Hills Turbine Ranch 2 wind power plant, Oregon

Eurus Combine Hills Turbine Ranch 2 is a 66.1 MW wind power plant in Umatilla County, Oregon, operated by Eurus Combine Hills II LLC, and it generated 136,983 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Oregon, and its capacity factor sits at the 23rd percentile of U.S. wind plants. By 2025 generation it ranks 3,040th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

66.1 MWNameplate capacity
25%Capacity factor, 2025, 23rd percentile, on 62 MW net summer
0.2%Of OR generation, 2025
15 yearsAverage generator age, by MW

How hard does the Eurus Combine Hills Turbine Ranch 2 plant run compared with other wind plants?

The Eurus Combine Hills Turbine Ranch 2 plant had a capacity factor of 25% in 2025 on 62 MW of net summer capacity, the 23rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 92 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Eurus Combine Hills Turbine Ranch 225%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Eurus Combine Hills Turbine Ranch 2 plant generating more or less than last year?

Generation at Eurus Combine Hills Turbine Ranch 2 fell 16.3% from 2024 to 2025, from 163,606 MWh to 136,983 MWh.

Net generation by period
PeriodMWh
2024163,606
2025136,983
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202515,361
November 20258,267
October 20254,581
September 20258,325
August 202511,041
July 202513,402
June 202514,808
May 202516,074
April 202513,654
March 202518,740
February 20258,209
January 20254,521
December 202413,090
November 202416,687
October 202410,399
September 202411,885
August 202411,211
July 202412,171
June 202413,754
May 202421,690
April 202416,996
March 202414,721
February 202411,314
January 20249,688

Source: EIA Form EIA-923, through August 2026.

How much of Oregon's electricity comes from the Eurus Combine Hills Turbine Ranch 2 plant?

Eurus Combine Hills Turbine Ranch 2 made 0.2% of the 64,124,656 MWh reported by Oregon plants in 2025, from 0.3% of the state's 19,040 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 51st largest of 302 plants in Oregon, the 3,412th largest of 14,327 in the U.S. and the 806th largest of 1,358 wind plants. By 2025 generation it is the 56th largest of 278 generating plants in the state.

Eurus Combine Hills Turbine Ranch 2 within Oregon, 2025
MeasureThis plantOregonShare
Capacity (MW)6619,0400.3%
Generation (MWh)136,98364,124,6560.2%
Wind capacity (MW)664,1811.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Eurus Combine Hills Turbine Ranch 2 plant, and when do they retire?

1 operable generator totals 66.1 MW, with an average age of 15 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s166100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine662010n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Eurus Combine Hills Turbine Ranch 2 plant?

EIA lists no joint owners for Eurus Combine Hills Turbine Ranch 2. Eurus Combine Hills II LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Eurus Combine Hills Turbine Ranch 2 plant?

Eurus Combine Hills Turbine Ranch 2 is in Milton Freewater, Umatilla County, Oregon, at 45.9430° N, 118.5910° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Oregon are similar in size?

Oregon has 50 operable wind plants with 4,181 MW of capacity, and Eurus Combine Hills Turbine Ranch 2's 66.1 MW is 2% of that.

Wind plants in Oregon around this size
PlantCountyMW2025 MWh
Star Point Wind Project LLCSherman99201,326
Klondike Windpower IISherman75235,838
Willow Creek Energy CenterMorrow72157,702
Eurus Combine Hills Turbine Ranch 2Umatilla66136,983
Condon Windpower LLCGilliam5073,221
Combine Hills IUmatilla4361,244

Source: EIA Forms EIA-860 and EIA-923, 2025.