Eurus Combine Hills Turbine Ranch 2 is a 66.1 MW wind power plant in Umatilla County, Oregon, operated by Eurus Combine Hills II LLC, and it generated 136,983 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Oregon, and its capacity factor sits at the 23rd percentile of U.S. wind plants. By 2025 generation it ranks 3,040th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Eurus Combine Hills Turbine Ranch 2 plant run compared with other wind plants?
The Eurus Combine Hills Turbine Ranch 2 plant had a capacity factor of 25% in 2025 on 62 MW of net summer capacity, the 23rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 92 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Eurus Combine Hills Turbine Ranch 2 | 25% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Eurus Combine Hills Turbine Ranch 2 plant generating more or less than last year?
Generation at Eurus Combine Hills Turbine Ranch 2 fell 16.3% from 2024 to 2025, from 163,606 MWh to 136,983 MWh.
| Period | MWh |
|---|---|
| 2024 | 163,606 |
| 2025 | 136,983 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 15,361 |
| November 2025 | 8,267 |
| October 2025 | 4,581 |
| September 2025 | 8,325 |
| August 2025 | 11,041 |
| July 2025 | 13,402 |
| June 2025 | 14,808 |
| May 2025 | 16,074 |
| April 2025 | 13,654 |
| March 2025 | 18,740 |
| February 2025 | 8,209 |
| January 2025 | 4,521 |
| December 2024 | 13,090 |
| November 2024 | 16,687 |
| October 2024 | 10,399 |
| September 2024 | 11,885 |
| August 2024 | 11,211 |
| July 2024 | 12,171 |
| June 2024 | 13,754 |
| May 2024 | 21,690 |
| April 2024 | 16,996 |
| March 2024 | 14,721 |
| February 2024 | 11,314 |
| January 2024 | 9,688 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Eurus Combine Hills Turbine Ranch 2 plant, and when do they retire?
1 operable generator totals 66.1 MW, with an average age of 15 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 66 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 66 | 2010 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Eurus Combine Hills Turbine Ranch 2 plant?
EIA lists no joint owners for Eurus Combine Hills Turbine Ranch 2. Eurus Combine Hills II LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Eurus Combine Hills Turbine Ranch 2 plant?
Eurus Combine Hills Turbine Ranch 2 is in Milton Freewater, Umatilla County, Oregon, at 45.9430° N, 118.5910° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Oregon are similar in size?
Oregon has 50 operable wind plants with 4,181 MW of capacity, and Eurus Combine Hills Turbine Ranch 2's 66.1 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Star Point Wind Project LLC | Sherman | 99 | 201,326 |
| Klondike Windpower II | Sherman | 75 | 235,838 |
| Willow Creek Energy Center | Morrow | 72 | 157,702 |
| Eurus Combine Hills Turbine Ranch 2 | Umatilla | 66 | 136,983 |
| Condon Windpower LLC | Gilliam | 50 | 73,221 |
| Combine Hills I | Umatilla | 43 | 61,244 |