Contrail Wind Farm, Iowa

Contrail Wind Farm is a 112 MW wind power plant in Taylor County, Iowa, operated by MidAmerican Energy Co, and it generated 325,234 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Iowa, and its capacity factor sits at the 52nd percentile of U.S. wind plants. By 2025 generation it ranks 1,860th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

112 MWNameplate capacity
34%Capacity factor, 2025, 52nd percentile, on 110 MW net summer
0.4%Of IA generation, 2025
5 yearsAverage generator age, by MW

How hard does the Contrail Wind Farm plant run compared with other wind plants?

The Contrail Wind Farm plant had a capacity factor of 34% in 2025 on 110 MW of net summer capacity, the 52nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 123 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Contrail Wind Farm34%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Contrail Wind Farm plant generating more or less than last year?

Generation at Contrail Wind Farm fell 3.4% from 2024 to 2025, from 336,617 MWh to 325,234 MWh. Through August 2026 it is running 6.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024336,617
2025325,234
2026 through August223,558
2025, same months209,668
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202616,676
July 202613,615
June 202622,499
May 202624,335
April 202643,198
March 202640,715
February 202630,066
January 202632,454
December 202536,225
November 202531,227
October 202532,213
September 202515,901
August 202517,668
July 202516,534
June 202520,203
May 202525,071
April 202528,995
March 202539,969
February 202530,395
January 202530,833
December 202428,000
November 202426,791
October 202429,460
September 202420,146
August 202418,944
July 202414,363
June 202428,017
May 202427,181
April 202440,155
March 202441,497
February 202435,834
January 202426,229

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Contrail Wind Farm plant?

Contrail Wind Farm made 0.4% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.5% of the state's 24,817 MW of capacity. By capacity it is the 74th largest of 306 plants in Iowa, the 2,413th largest of 14,327 in the U.S. and the 585th largest of 1,358 wind plants. By 2025 generation it is the 63rd largest of 283 generating plants in the state.

Contrail Wind Farm within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)11224,8170.5%
Generation (MWh)325,23474,502,3730.4%
Wind capacity (MW)11213,4100.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Contrail Wind Farm plant, and when do they retire?

1 operable generator totals 112 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1112100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
COWFOperatingOnshore Wind Turbine1122020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Contrail Wind Farm plant?

EIA lists no joint owners for Contrail Wind Farm. MidAmerican Energy Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does MidAmerican Energy Co charge homes?

MidAmerican Energy Co, the operator of Contrail Wind Farm, had an average residential price of 11.21¢ per kWh and an average bill of $93 a month in 2025, 18% below the Iowa average of 13.62¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Iowa
MidAmerican Energy Co11.21¢$9318% lower
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Contrail Wind Farm plant?

Contrail Wind Farm is in Bedford, Taylor County, Iowa, at 40.6674° N, 94.8316° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Contrail Wind Farm's 112 MW is 1% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Laurel Wind FarmMarshall123469,972
Macksburg Wind ProjectMadison120248,695
Storm Lake 1Buena Vista11486,924
Contrail Wind FarmTaylor112325,234
Morning Light Wind FarmAdair111406,814
Victory Wind FarmCarroll105384,050
Heartland Divide Wind Project, LLCAudubon104425,811

Source: EIA Forms EIA-860 and EIA-923, 2025.