Wind power plant, Iowa

Heartland Divide Wind Project, LLC power plant, Iowa

Heartland Divide Wind Project, LLC is a 104 MW wind power plant in Audubon County, Iowa, operated by Heartland Divide Wind Project, LLC, and it generated 425,811 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Iowa, and its capacity factor sits at the 95th percentile of U.S. wind plants. By 2025 generation it ranks 1,515th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

104 MWNameplate capacity
47%Capacity factor, 2025, 95th percentile, on 104 MW net summer
0.6%Of IA generation, 2025
7 yearsAverage generator age, by MW

How hard does the Heartland Divide Wind Project, LLC plant run compared with other wind plants?

The Heartland Divide Wind Project, LLC plant had a capacity factor of 47% in 2025 on 104 MW of net summer capacity, the 95th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 171 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Heartland Divide Wind Project, LLC47%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Heartland Divide Wind Project, LLC plant generating more or less than last year?

Generation at Heartland Divide Wind Project, LLC fell 1.9% from 2024 to 2025, from 434,164 MWh to 425,811 MWh. Through August 2026 it is running 1.2% behind the same months of 2025.

Net generation by period
PeriodMWh
2024434,164
2025425,811
2026 through August275,672
2025, same months279,007
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202617,465
July 202619,289
June 202631,565
May 202635,908
April 202647,697
March 202646,273
February 202637,233
January 202640,242
December 202545,125
November 202539,952
October 202540,411
September 202521,316
August 202519,303
July 202524,749
June 202529,285
May 202531,034
April 202544,013
March 202544,692
February 202539,696
January 202546,235
December 202437,258
November 202440,257
October 202446,291
September 202430,357
August 202420,987
July 202420,548
June 202434,850
May 202433,694
April 202449,611
March 202446,765
February 202440,388
January 202433,158

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Heartland Divide Wind Project, LLC plant?

Heartland Divide Wind Project, LLC made 0.6% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.4% of the state's 24,817 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 78th largest of 306 plants in Iowa, the 2,523rd largest of 14,327 in the U.S. and the 623rd largest of 1,358 wind plants. By 2025 generation it is the 54th largest of 283 generating plants in the state.

Heartland Divide Wind Project, LLC within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)10424,8170.4%
Generation (MWh)425,81174,502,3730.6%
Wind capacity (MW)10413,4100.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Heartland Divide Wind Project, LLC plant, and when do they retire?

1 operable generator totals 104 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1104100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine1042018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Heartland Divide Wind Project, LLC plant?

EIA lists no joint owners for Heartland Divide Wind Project, LLC. Heartland Divide Wind Project, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Heartland Divide Wind Project, LLC plant?

Heartland Divide Wind Project, LLC is in Melville, Audubon County, Iowa, at 41.7114° N, 94.8020° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Heartland Divide Wind Project, LLC's 104 MW is 1% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Contrail Wind FarmTaylor112325,234
Morning Light Wind FarmAdair111406,814
Victory Wind FarmCarroll105384,050
Heartland Divide Wind Project, LLCAudubon104425,811
Lost Lakes Wind Farm LLCDickinson100270,128
New Harvest Wind Project LLCCrawford100262,989
Crane Creek Wind Energy CenterHoward99284,033

Source: EIA Forms EIA-860 and EIA-923, 2025.