Wind power plant, Iowa

New Harvest Wind Project LLC power plant, Iowa

New Harvest Wind Project LLC is a 100 MW wind power plant in Crawford County, Iowa, operated by Avangrid Power LLC, and it generated 262,989 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Iowa, and its capacity factor sits at the 39th percentile of U.S. wind plants. By 2025 generation it ranks 2,144th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
30%Capacity factor, 2025, 39th percentile, on 100 MW net summer
0.4%Of IA generation, 2025
14 yearsAverage generator age, by MW

How hard does the New Harvest Wind Project LLC plant run compared with other wind plants?

The New Harvest Wind Project LLC plant had a capacity factor of 30% in 2025 on 100 MW of net summer capacity, the 39th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 110 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
New Harvest Wind Project LLC30%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the New Harvest Wind Project LLC plant generating more or less than last year?

Generation at New Harvest Wind Project LLC fell 8.5% from 2024 to 2025, from 287,462 MWh to 262,989 MWh.

Net generation by period
PeriodMWh
2024287,462
2025262,989
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202529,378
November 202524,908
October 202524,957
September 202514,543
August 202510,875
July 202513,086
June 202516,182
May 202516,689
April 202532,592
March 202530,924
February 202524,448
January 202524,407
December 202427,954
November 202425,506
October 202429,360
September 202418,579
August 202413,185
July 202411,306
June 202418,505
May 202421,066
April 202437,320
March 202436,254
February 202428,858
January 202419,569

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the New Harvest Wind Project LLC plant?

New Harvest Wind Project LLC made 0.4% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.4% of the state's 24,817 MW of capacity. By capacity it is the 79th largest of 306 plants in Iowa, the 2,602nd largest of 14,327 in the U.S. and the 670th largest of 1,358 wind plants. By 2025 generation it is the 74th largest of 283 generating plants in the state.

New Harvest Wind Project LLC within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)10024,8170.4%
Generation (MWh)262,98974,502,3730.4%
Wind capacity (MW)10013,4100.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the New Harvest Wind Project LLC plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine1002011n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the New Harvest Wind Project LLC plant?

EIA lists no joint owners for New Harvest Wind Project LLC. Avangrid Power LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the New Harvest Wind Project LLC plant?

New Harvest Wind Project LLC is in Schleswig, Crawford County, Iowa, at 42.1597° N, 95.4397° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and New Harvest Wind Project LLC's 100 MW is 1% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Victory Wind FarmCarroll105384,050
Heartland Divide Wind Project, LLCAudubon104425,811
Lost Lakes Wind Farm LLCDickinson100270,128
New Harvest Wind Project LLCCrawford100262,989
Crane Creek Wind Energy CenterHoward99284,033
Franklin County Wind FarmFranklin99270,522
Osceola Windpower LLCOsceola98393,767

Source: EIA Forms EIA-860 and EIA-923, 2025.