Natural gas power plant, Arizona
Coolidge Generation Station, Arizona
Coolidge Generation Station is a 726 MW natural gas power plant in Pinal County, Arizona, operated by Salt River Project, and it generated 58,818 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Arizona, and its capacity factor sits at the 11th percentile of U.S. natural gas plants. By 2025 generation it ranks 3,892nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Coolidge Generation Station run compared with other natural gas plants?
Coolidge Generation Station had a capacity factor of 1% in 2025 on 521 MW of net summer capacity, the 11th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 5 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Coolidge Generation Station | 1% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Coolidge Generation Station generating more or less than last year?
Generation at Coolidge Generation Station fell 70.2% from 2024 to 2025, from 197,336 MWh to 58,818 MWh. Through August 2026 it is running 144.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 197,336 |
| 2025 | 58,818 |
| 2026 through August | 94,406 |
| 2025, same months | 38,569 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 29,254 |
| July 2026 | 36,628 |
| June 2026 | 5,822 |
| May 2026 | 10,895 |
| April 2026 | 8,632 |
| March 2026 | 1,574 |
| February 2026 | 603 |
| January 2026 | 998 |
| December 2025 | 1,529 |
| November 2025 | 3,209 |
| October 2025 | 12,383 |
| September 2025 | 3,128 |
| August 2025 | 5,298 |
| July 2025 | 5,493 |
| June 2025 | 4,898 |
| May 2025 | 4,686 |
| April 2025 | 5,264 |
| March 2025 | 8,353 |
| February 2025 | 1,999 |
| January 2025 | 2,578 |
| December 2024 | 4,709 |
| November 2024 | 7,049 |
| October 2024 | 1,032 |
| September 2024 | 3,099 |
| August 2024 | 10,543 |
| July 2024 | 11,686 |
| June 2024 | 13,727 |
| May 2024 | 22,749 |
| April 2024 | 39,231 |
| March 2024 | 39,961 |
| February 2024 | 31,743 |
| January 2024 | 11,807 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Coolidge Generation Station, and when do they retire?
12 operable generators total 726 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 12 more are proposed, totalling 594 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 12 | 726 | 100% | none reported |
Every generator, 24 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2011 | n/a |
| 2 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2011 | n/a |
| 3 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2011 | n/a |
| 4 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2011 | n/a |
| 5 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2011 | n/a |
| 6 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2011 | n/a |
| 7 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2011 | n/a |
| 8 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2011 | n/a |
| 9 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2011 | n/a |
| 10 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2011 | n/a |
| 11 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2011 | n/a |
| 12 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2011 | n/a |
| COE13 | Under construction, under half built | Natural Gas Fired Combustion Turbine | 50 | 2026 | n/a |
| COE14 | Under construction, under half built | Natural Gas Fired Combustion Turbine | 50 | 2026 | n/a |
| COE15 | Under construction, under half built | Natural Gas Fired Combustion Turbine | 50 | 2026 | n/a |
| COE16 | Under construction, under half built | Natural Gas Fired Combustion Turbine | 50 | 2026 | n/a |
| COE17 | Under construction, under half built | Natural Gas Fired Combustion Turbine | 50 | 2026 | n/a |
| COE18 | Under construction, under half built | Natural Gas Fired Combustion Turbine | 50 | 2026 | n/a |
| COE19 | Under construction, under half built | Natural Gas Fired Combustion Turbine | 50 | 2027 | n/a |
| COE20 | Under construction, under half built | Natural Gas Fired Combustion Turbine | 50 | 2027 | n/a |
| COE21 | Under construction, under half built | Natural Gas Fired Combustion Turbine | 50 | 2027 | n/a |
| COE22 | Under construction, under half built | Natural Gas Fired Combustion Turbine | 50 | 2027 | n/a |
| COE23 | Under construction, under half built | Natural Gas Fired Combustion Turbine | 50 | 2027 | n/a |
| COE24 | Under construction, under half built | Natural Gas Fired Combustion Turbine | 50 | 2027 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Coolidge Generation Station?
EIA lists no joint owners for Coolidge Generation Station. Salt River Project operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Salt River Project charge homes?
Salt River Project, the operator of Coolidge Generation Station, had an average residential price of 13.98¢ per kWh and an average bill of $160 a month in 2025, 8% below the Arizona average of 15.26¢.
| Measure | Price | Monthly bill | Against Arizona |
|---|---|---|---|
| Salt River Project | 13.98¢ | $160 | 8% lower |
| Arizona average | 15.26¢ | $157 | |
| U.S. average | 17.23¢ | $151 | 13% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is Coolidge Generation Station?
Coolidge Generation Station is in Coolidge, Pinal County, Arizona, at 32.9174° N, 111.5033° W. It sits in the Salt River Project balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Arizona are similar in size?
Arizona has 33 operable natural gas plants with 17,386 MW of capacity, and Coolidge Generation Station's 726 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Red Hawk | Maricopa | 1,127 | 4,842,624 |
| Ocotillo | Maricopa | 806 | 443,322 |
| Desert Basin | Pinal | 745 | 2,084,973 |
| Coolidge Generation Station | Pinal | 726 | 58,818 |
| Arlington Valley Energy Facility | Maricopa | 713 | 3,345,489 |
| Agua Fria | Maricopa | 712 | 247,148 |
| South Point Energy Center | Mohave | 708 | 2,024,909 |
Source: EIA Forms EIA-860 and EIA-923, 2025.