Natural gas power plant, Arizona

Coolidge Generation Station, Arizona

Coolidge Generation Station is a 726 MW natural gas power plant in Pinal County, Arizona, operated by Salt River Project, and it generated 58,818 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Arizona, and its capacity factor sits at the 11th percentile of U.S. natural gas plants. By 2025 generation it ranks 3,892nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

726 MWNameplate capacity
1%Capacity factor, 2025, 11th percentile, on 521 MW net summer
0.1%Of AZ generation, 2025
14 yearsAverage generator age, by MW

How hard does Coolidge Generation Station run compared with other natural gas plants?

Coolidge Generation Station had a capacity factor of 1% in 2025 on 521 MW of net summer capacity, the 11th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 5 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Coolidge Generation Station1%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Coolidge Generation Station generating more or less than last year?

Generation at Coolidge Generation Station fell 70.2% from 2024 to 2025, from 197,336 MWh to 58,818 MWh. Through August 2026 it is running 144.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024197,336
202558,818
2026 through August94,406
2025, same months38,569
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202629,254
July 202636,628
June 20265,822
May 202610,895
April 20268,632
March 20261,574
February 2026603
January 2026998
December 20251,529
November 20253,209
October 202512,383
September 20253,128
August 20255,298
July 20255,493
June 20254,898
May 20254,686
April 20255,264
March 20258,353
February 20251,999
January 20252,578
December 20244,709
November 20247,049
October 20241,032
September 20243,099
August 202410,543
July 202411,686
June 202413,727
May 202422,749
April 202439,231
March 202439,961
February 202431,743
January 202411,807

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from Coolidge Generation Station?

Coolidge Generation Station made 0.1% of the 115,800,378 MWh reported by Arizona plants in 2025, from 1.8% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 15th largest of 191 plants in Arizona, the 464th largest of 14,327 in the U.S. and the 262nd largest of 1,962 natural gas plants. By 2025 generation it is the 80th largest of 167 generating plants in the state.

Coolidge Generation Station within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)72640,5141.8%
Generation (MWh)58,818115,800,3780.1%
Natural gas capacity (MW)72617,3864.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Coolidge Generation Station, and when do they retire?

12 operable generators total 726 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 12 more are proposed, totalling 594 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s12726100%none reported
Every generator, 24 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNatural Gas Fired Combustion Turbine612011n/a
2OperatingNatural Gas Fired Combustion Turbine612011n/a
3OperatingNatural Gas Fired Combustion Turbine612011n/a
4OperatingNatural Gas Fired Combustion Turbine612011n/a
5OperatingNatural Gas Fired Combustion Turbine612011n/a
6OperatingNatural Gas Fired Combustion Turbine612011n/a
7OperatingNatural Gas Fired Combustion Turbine612011n/a
8OperatingNatural Gas Fired Combustion Turbine612011n/a
9OperatingNatural Gas Fired Combustion Turbine612011n/a
10OperatingNatural Gas Fired Combustion Turbine612011n/a
11OperatingNatural Gas Fired Combustion Turbine612011n/a
12OperatingNatural Gas Fired Combustion Turbine612011n/a
COE13Under construction, under half builtNatural Gas Fired Combustion Turbine502026n/a
COE14Under construction, under half builtNatural Gas Fired Combustion Turbine502026n/a
COE15Under construction, under half builtNatural Gas Fired Combustion Turbine502026n/a
COE16Under construction, under half builtNatural Gas Fired Combustion Turbine502026n/a
COE17Under construction, under half builtNatural Gas Fired Combustion Turbine502026n/a
COE18Under construction, under half builtNatural Gas Fired Combustion Turbine502026n/a
COE19Under construction, under half builtNatural Gas Fired Combustion Turbine502027n/a
COE20Under construction, under half builtNatural Gas Fired Combustion Turbine502027n/a
COE21Under construction, under half builtNatural Gas Fired Combustion Turbine502027n/a
COE22Under construction, under half builtNatural Gas Fired Combustion Turbine502027n/a
COE23Under construction, under half builtNatural Gas Fired Combustion Turbine502027n/a
COE24Under construction, under half builtNatural Gas Fired Combustion Turbine502027n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Coolidge Generation Station?

EIA lists no joint owners for Coolidge Generation Station. Salt River Project operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Salt River Project charge homes?

Salt River Project, the operator of Coolidge Generation Station, had an average residential price of 13.98¢ per kWh and an average bill of $160 a month in 2025, 8% below the Arizona average of 15.26¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Arizona
Salt River Project13.98¢$1608% lower
Arizona average15.26¢$157
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Coolidge Generation Station?

Coolidge Generation Station is in Coolidge, Pinal County, Arizona, at 32.9174° N, 111.5033° W. It sits in the Salt River Project balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Arizona are similar in size?

Arizona has 33 operable natural gas plants with 17,386 MW of capacity, and Coolidge Generation Station's 726 MW is 4% of that.

Natural gas plants in Arizona around this size
PlantCountyMW2025 MWh
Red HawkMaricopa1,1274,842,624
OcotilloMaricopa806443,322
Desert BasinPinal7452,084,973
Coolidge Generation StationPinal72658,818
Arlington Valley Energy FacilityMaricopa7133,345,489
Agua FriaMaricopa712247,148
South Point Energy CenterMohave7082,024,909

Source: EIA Forms EIA-860 and EIA-923, 2025.