Skip to main content
RateWatt

Natural gas power plant, Arizona

Desert Basin natural gas power plant, Arizona

Desert Basin is a 745 MW natural gas power plant in Pinal County, Arizona, operated by Salt River Project, and it generated 2,084,973 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.8% of the generation reported in Arizona, and its capacity factor sits at the 60th percentile of U.S. natural gas plants. By 2025 generation it ranks 491st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

745 MWNameplate capacity
34%Capacity factor, 2025, 60th percentile, on 704 MW net summer
1.8%Of AZ generation, 2025
21 yearsAverage generator age, by MW

How hard does the Desert Basin plant run compared with other natural gas plants?

The Desert Basin plant had a capacity factor of 34% in 2025 on 704 MW of net summer capacity, the 60th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 123 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Desert Basin34%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Desert Basin plant generating more or less than last year?

Generation at Desert Basin fell 23.9% from 2024 to 2025, from 2,741,391 MWh to 2,084,973 MWh. Through August 2026 it is running 19.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20242,741,391
20252,084,973
2026 through August1,714,028
2025, same months1,429,285
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026363,304
July 2026371,196
June 2026295,213
May 202656,931
April 20261,137
March 20264,544
February 2026287,935
January 2026333,768
December 202581,631
November 2025137,691
October 2025127,396
September 2025308,970
August 2025379,306
July 2025357,488
June 2025207,505
May 2025232,167
April 2025215,271
March 202515,924
February 20259,791
January 202511,833
December 202424,364
November 202469,607
October 2024128,999
September 2024254,419
August 2024368,419
July 2024367,171
June 2024312,863
May 2024200,857
April 2024282,513
March 2024105,565
February 2024302,612
January 2024324,002

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Desert Basin plant?

Desert Basin made 1.8% of the 115,800,378 MWh reported by Arizona plants in 2025, from 1.8% of the state's 40,514 MW of capacity. By capacity it is the 13th largest of 191 plants in Arizona, the 448th largest of 14,327 in the U.S. and the 249th largest of 1,962 natural gas plants. By 2025 generation it is the 18th largest of 167 generating plants in the state.

Desert Basin within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)74540,5141.8%
Generation (MWh)2,084,973115,800,3781.8%
Natural gas capacity (MW)74517,3864.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Desert Basin plant, and when do they retire?

5 operable generators total 745 MW, with an average age of 21 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s364687%none reported
2020s29913%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CTG1OperatingNatural Gas Fired Combined Cycle1872001n/a
CTG2OperatingNatural Gas Fired Combined Cycle1872001n/a
STGOperatingNatural Gas Fired Combined Cycle2722001n/a
CTG4OperatingNatural Gas Fired Combustion Turbine502022n/a
CTG5OperatingNatural Gas Fired Combustion Turbine502022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Desert Basin plant?

EIA lists no joint owners for Desert Basin. Salt River Project operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Salt River Project charge homes?

Salt River Project, the operator of Desert Basin, had an average residential price of 13.98¢ per kWh and an average bill of $160 a month in 2025, 8% below the Arizona average of 15.26¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Arizona
Salt River Project13.98¢$1608% lower
Arizona average15.26¢$157
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Desert Basin plant?

Desert Basin is in Casa Grande, Pinal County, Arizona, at 32.9042° N, 111.7889° W. It sits in the Salt River Project balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Arizona are similar in size?

Arizona has 33 operable natural gas plants with 17,386 MW of capacity, and Desert Basin's 745 MW is 4% of that.

Natural gas plants in Arizona around this size
PlantCountyMW2025 MWh
West PhoenixMaricopa1,2074,277,340
Red HawkMaricopa1,1274,842,624
OcotilloMaricopa806443,322
Desert BasinPinal7452,084,973
Coolidge Generation StationPinal72658,818
Arlington Valley Energy FacilityMaricopa7133,345,489
Agua FriaMaricopa712247,148

Source: EIA Forms EIA-860 and EIA-923, 2025.