Solar power plant, California

Corcoran Solar 3 power plant, California

Corcoran Solar 3 is a 20 MW solar power plant in Kings County, California, operated by RWE Clean Energy, and it generated 48,100 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 80th percentile of U.S. solar plants. By 2025 generation it ranks 4,144th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
27%Capacity factor, 2025, 80th percentile, on 20 MW net summer
4,144thU.S. rank by generation, 2025
9 yearsAverage generator age, by MW

How hard does the Corcoran Solar 3 plant run compared with other solar plants?

The Corcoran Solar 3 plant had a capacity factor of 27% in 2025 on 20 MW of net summer capacity, the 80th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 100 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Corcoran Solar 327%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Corcoran Solar 3 plant generating more or less than last year?

Generation at Corcoran Solar 3 rose 3.6% from 2024 to 2025, from 46,423 MWh to 48,100 MWh.

Net generation by period
PeriodMWh
202446,423
202548,100
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025892
November 20251,799
October 20253,919
September 20253,930
August 20255,302
July 20256,609
June 20256,354
May 20256,260
April 20254,744
March 20254,156
February 20252,187
January 20251,948
December 20241,590
November 20242,462
October 20242,707
September 20243,552
August 20245,114
July 20245,914
June 20245,823
May 20246,605
April 20244,424
March 20243,632
February 20242,869
January 20241,731

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Corcoran Solar 3 plant?

Corcoran Solar 3 made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,150th largest of 7,223 solar plants. By 2025 generation it is the 468th largest of 1,608 generating plants in the state.

Corcoran Solar 3 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)48,100204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Corcoran Solar 3 plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
C3CAOperatingSolar Photovoltaic202016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Corcoran Solar 3 plant?

EIA lists no joint owners for Corcoran Solar 3. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Corcoran Solar 3 plant?

Corcoran Solar 3 is in Corcoran, Kings County, California, at 36.1504° N, 119.5854° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Corcoran Solar 3's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
SEPV Mojave WestKern2052,657
Kingbird A Solar LLCKern2038,155
Windhub Solar A LLCKern2047,960
Corcoran Solar 3Kings2048,100
Oro LomaFresno2049,174
Western Antelope Blue Sky BLos Angeles2052,233
North Lancaster RanchLos Angeles2038,557

Source: EIA Forms EIA-860 and EIA-923, 2025.