Solar power plant, Florida
CoTAL Solar Farm, Florida
CoTAL Solar Farm is a 20 MW solar power plant in Leon County, Florida, operated by Onward Energy, and it generated 38,046 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 39th percentile of U.S. solar plants. By 2025 generation it ranks 4,428th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the CoTAL Solar Farm plant run compared with other solar plants?
The CoTAL Solar Farm plant had a capacity factor of 22% in 2025 on 20 MW of net summer capacity, the 39th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 79 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| CoTAL Solar Farm | 22% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the CoTAL Solar Farm plant generating more or less than last year?
Generation at CoTAL Solar Farm rose 17.3% from 2024 to 2025, from 32,436 MWh to 38,046 MWh.
| Period | MWh |
|---|---|
| 2024 | 32,436 |
| 2025 | 38,046 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 2,584 |
| November 2025 | 3,411 |
| October 2025 | 3,294 |
| September 2025 | 3,740 |
| August 2025 | 3,149 |
| July 2025 | 3,488 |
| June 2025 | 2,987 |
| May 2025 | 3,427 |
| April 2025 | 3,378 |
| March 2025 | 3,533 |
| February 2025 | 2,370 |
| January 2025 | 2,685 |
| December 2024 | 2,463 |
| November 2024 | 2,263 |
| October 2024 | 3,178 |
| September 2024 | 2,175 |
| August 2024 | 2,369 |
| July 2024 | 2,542 |
| June 2024 | 2,998 |
| May 2024 | 2,598 |
| April 2024 | 3,098 |
| March 2024 | 2,909 |
| February 2024 | 3,077 |
| January 2024 | 2,766 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the CoTAL Solar Farm plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PV1 | Operating | Solar Photovoltaic | 20 | 2017 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the CoTAL Solar Farm plant?
EIA lists no joint owners for CoTAL Solar Farm. Onward Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the CoTAL Solar Farm plant?
CoTAL Solar Farm is in Tallahassee, Leon County, Florida, at 30.3793° N, 84.3539° W. It sits in the City of Tallahassee balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Florida are similar in size?
Florida has 210 operable solar plants with 12,223 MW of capacity, and CoTAL Solar Farm's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| DeSoto Next Generation Solar Energy | DeSoto | 25 | 30,459 |
| Dover Solar and Battery Storage | Hillsborough | 25 | 47,890 |
| English Creek Solar | Hillsborough | 23 | 53,276 |
| CoTAL Solar Farm | Leon | 20 | 38,046 |
| Big Bend 1 Solar and Battery Storage | Hillsborough | 20 | 2,239 |
| Jacksonville Solar | Duval | 13 | 8,753 |
| Space Coast Next Gen Solar Energy | Brevard | 10 | 10,502 |
Source: EIA Forms EIA-860 and EIA-923, 2025.