Skip to main content
RateWatt

Solar power plant, Florida

English Creek Solar power plant, Florida

English Creek Solar is a 23 MW solar power plant in Hillsborough County, Florida, operated by Tampa Electric Co, and it generated 53,276 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 74th percentile of U.S. solar plants. By 2025 generation it ranks 4,017th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

23 MWNameplate capacity
26%Capacity factor, 2025, 74th percentile, on 23 MW net summer
4,017thU.S. rank by generation, 2025
1 yearAverage generator age, by MW

How hard does the English Creek Solar plant run compared with other solar plants?

The English Creek Solar plant had a capacity factor of 26% in 2025 on 23 MW of net summer capacity, the 74th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 97 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
English Creek Solar26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the English Creek Solar plant generating more or less than last year?

English Creek Solar generated 53,276 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 1 month, so the two years are not compared.

Net generation by period
PeriodMWh
2024791
202553,276
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,594
November 20253,300
October 20253,878
September 20253,504
August 20253,792
July 20254,846
June 20254,576
May 20254,909
April 20255,339
March 20254,430
February 20252,462
January 20259,646
December 2024791
November 20240
October 20240
September 20240
August 20240
July 20240
June 20240
May 20240
April 20240
March 20240
February 20240
January 20240

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the English Creek Solar plant?

English Creek Solar made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.0% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 255th largest of 331 plants in Florida, the 4,644th largest of 14,327 in the U.S. and the 1,062nd largest of 7,223 solar plants. By 2025 generation it is the 242nd largest of 313 generating plants in the state.

English Creek Solar within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)2379,9360.0%
Generation (MWh)53,276267,867,7350.0%
Solar capacity (MW)2312,2230.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the English Creek Solar plant, and when do they retire?

1 operable generator totals 23 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s123100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic232024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the English Creek Solar plant?

EIA lists no joint owners for English Creek Solar. Tampa Electric Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Tampa Electric Co charge homes?

Tampa Electric Co, the operator of English Creek Solar, had an average residential price of 17.32¢ per kWh and an average bill of $194 a month in 2025, 14% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Tampa Electric Co17.32¢$19414% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the English Creek Solar plant?

English Creek Solar is in Plant City, Hillsborough County, Florida, at 27.9458° N, 82.0672° W. It sits in the Tampa Electric Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and English Creek Solar's 23 MW is 0% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Gulf Coast Solar Center IOkaloosa3061,230
DeSoto Next Generation Solar EnergyDeSoto2530,459
Dover Solar and Battery StorageHillsborough2547,890
English Creek SolarHillsborough2353,276
CoTAL Solar FarmLeon2038,046
Big Bend 1 Solar and Battery StorageHillsborough202,239
Jacksonville SolarDuval138,753

Source: EIA Forms EIA-860 and EIA-923, 2025.