Solar power plant, Florida
Gulf Coast Solar Center I power plant, Florida
Gulf Coast Solar Center I is a 30 MW solar power plant in Okaloosa County, Florida, operated by Arevon Energy, Inc., and it generated 61,230 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 51st percentile of U.S. solar plants. By 2025 generation it ranks 3,859th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Gulf Coast Solar Center I plant run compared with other solar plants?
The Gulf Coast Solar Center I plant had a capacity factor of 23% in 2025 on 30 MW of net summer capacity, the 51st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 85 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Gulf Coast Solar Center I | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Gulf Coast Solar Center I plant generating more or less than last year?
Generation at Gulf Coast Solar Center I rose 4.8% from 2024 to 2025, from 58,446 MWh to 61,230 MWh. Through August 2026 it is running 0.4% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 58,446 |
| 2025 | 61,230 |
| 2026 through August | 41,583 |
| 2025, same months | 41,752 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 5,443 |
| July 2026 | 5,777 |
| June 2026 | 5,202 |
| May 2026 | 4,801 |
| April 2026 | 5,598 |
| March 2026 | 6,082 |
| February 2026 | 4,311 |
| January 2026 | 4,369 |
| December 2025 | 3,751 |
| November 2025 | 4,773 |
| October 2025 | 5,201 |
| September 2025 | 5,753 |
| August 2025 | 4,935 |
| July 2025 | 5,549 |
| June 2025 | 5,250 |
| May 2025 | 5,758 |
| April 2025 | 5,688 |
| March 2025 | 5,441 |
| February 2025 | 5,059 |
| January 2025 | 4,072 |
| December 2024 | 4,272 |
| November 2024 | 3,875 |
| October 2024 | 5,667 |
| September 2024 | 4,361 |
| August 2024 | 6,076 |
| July 2024 | 5,572 |
| June 2024 | 5,663 |
| May 2024 | 5,460 |
| April 2024 | 5,474 |
| March 2024 | 4,761 |
| February 2024 | 3,745 |
| January 2024 | 3,520 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Gulf Coast Solar Center I plant, and when do they retire?
1 operable generator totals 30 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 30 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GCSC1 | Operating | Solar Photovoltaic | 30 | 2017 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Gulf Coast Solar Center I plant?
EIA lists no joint owners for Gulf Coast Solar Center I. Arevon Energy, Inc. operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Gulf Coast Solar Center I plant?
Gulf Coast Solar Center I is in Valparaiso, Okaloosa County, Florida, at 30.5154° N, 86.5184° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Florida are similar in size?
Florida has 210 operable solar plants with 12,223 MW of capacity, and Gulf Coast Solar Center I's 30 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| FL Solar 4, LLC | Leon | 42 | 69,918 |
| Gulf Coast Solar Center II | Santa Rosa | 40 | 78,781 |
| Bonnie Mine Solar | Polk | 38 | 66,506 |
| Gulf Coast Solar Center I | Okaloosa | 30 | 61,230 |
| DeSoto Next Generation Solar Energy | DeSoto | 25 | 30,459 |
| Dover Solar and Battery Storage | Hillsborough | 25 | 47,890 |
| English Creek Solar | Hillsborough | 23 | 53,276 |
Source: EIA Forms EIA-860 and EIA-923, 2025.