Bonnie Mine Solar is a 37.5 MW solar power plant in Polk County, Florida, operated by Tampa Electric Co, and it generated 66,506 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 27th percentile of U.S. solar plants. By 2025 generation it ranks 3,789th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

37.5 MWNameplate capacity
20%Capacity factor, 2025, 27th percentile, on 37.5 MW net summer
3,789thU.S. rank by generation, 2025
6 yearsAverage generator age, by MW

How hard does the Bonnie Mine Solar plant run compared with other solar plants?

The Bonnie Mine Solar plant had a capacity factor of 20% in 2025 on 37.5 MW of net summer capacity, the 27th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 74 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Bonnie Mine Solar20%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Bonnie Mine Solar plant generating more or less than last year?

Generation at Bonnie Mine Solar rose 15.0% from 2024 to 2025, from 57,843 MWh to 66,506 MWh. Through August 2026 it is running 1.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202457,843
202566,506
2026 through August48,111
2025, same months47,419
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20266,153
July 20266,320
June 20266,900
May 20267,008
April 20266,702
March 20266,057
February 20264,686
January 20264,285
December 20253,914
November 20254,420
October 20255,487
September 20255,266
August 20255,903
July 20256,647
June 20256,174
May 20256,824
April 20257,854
March 20256,393
February 20253,965
January 20253,659
December 20243,666
November 20244,132
October 20243,615
September 20244,865
August 20245,232
July 20245,446
June 20245,721
May 20246,231
April 20246,092
March 20245,150
February 20244,813
January 20242,880

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Bonnie Mine Solar plant?

Bonnie Mine Solar made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.0% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 248th largest of 331 plants in Florida, the 4,181st largest of 14,327 in the U.S. and the 986th largest of 7,223 solar plants. By 2025 generation it is the 238th largest of 313 generating plants in the state.

Bonnie Mine Solar within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)3879,9360.0%
Generation (MWh)66,506267,867,7350.0%
Solar capacity (MW)3812,2230.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Bonnie Mine Solar plant, and when do they retire?

1 operable generator totals 37.5 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s138100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic382019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Bonnie Mine Solar plant?

EIA lists no joint owners for Bonnie Mine Solar. Tampa Electric Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Tampa Electric Co charge homes?

Tampa Electric Co, the operator of Bonnie Mine Solar, had an average residential price of 17.32¢ per kWh and an average bill of $194 a month in 2025, 14% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Tampa Electric Co17.32¢$19414% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Bonnie Mine Solar plant?

Bonnie Mine Solar is in Bartow, Polk County, Florida, at 27.8901° N, 81.9872° W. It sits in the Tampa Electric Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Bonnie Mine Solar's 37.5 MW is 0% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Lake Placid Solar Power PlantHighlands4572,837
FL Solar 4, LLCLeon4269,918
Gulf Coast Solar Center IISanta Rosa4078,781
Bonnie Mine SolarPolk3866,506
Gulf Coast Solar Center IOkaloosa3061,230
DeSoto Next Generation Solar EnergyDeSoto2530,459
Dover Solar and Battery StorageHillsborough2547,890