Gulf Coast Solar Center II power plant, Florida

Gulf Coast Solar Center II is a 40 MW solar power plant in Santa Rosa County, Florida, operated by Arevon Energy, Inc., and it generated 78,781 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 45th percentile of U.S. solar plants. By 2025 generation it ranks 3,658th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

40 MWNameplate capacity
22%Capacity factor, 2025, 45th percentile, on 40 MW net summer
3,658thU.S. rank by generation, 2025
8 yearsAverage generator age, by MW

How hard does the Gulf Coast Solar Center II plant run compared with other solar plants?

The Gulf Coast Solar Center II plant had a capacity factor of 22% in 2025 on 40 MW of net summer capacity, the 45th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 82 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Gulf Coast Solar Center II22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Gulf Coast Solar Center II plant generating more or less than last year?

Generation at Gulf Coast Solar Center II fell 0.9% from 2024 to 2025, from 79,464 MWh to 78,781 MWh. Through August 2026 it is running 6.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202479,464
202578,781
2026 through August56,793
2025, same months53,379
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20267,508
July 20267,885
June 20267,298
May 20267,074
April 20267,794
March 20267,559
February 20266,286
January 20265,389
December 20254,896
November 20256,272
October 20256,564
September 20257,670
August 20256,162
July 20258,027
June 20257,094
May 20257,594
April 20257,745
March 20256,865
February 20254,773
January 20255,119
December 20245,203
November 20245,590
October 20247,224
September 20245,763
August 20248,153
July 20247,589
June 20247,680
May 20247,820
April 20247,631
March 20246,422
February 20245,285
January 20245,104

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Gulf Coast Solar Center II plant?

Gulf Coast Solar Center II made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 245th largest of 331 plants in Florida, the 4,074th largest of 14,327 in the U.S. and the 963rd largest of 7,223 solar plants. By 2025 generation it is the 234th largest of 313 generating plants in the state.

Gulf Coast Solar Center II within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)4079,9360.1%
Generation (MWh)78,781267,867,7350.0%
Solar capacity (MW)4012,2230.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Gulf Coast Solar Center II plant, and when do they retire?

1 operable generator totals 40 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s140100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GCSC2OperatingSolar Photovoltaic402017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Gulf Coast Solar Center II plant?

EIA lists no joint owners for Gulf Coast Solar Center II. Arevon Energy, Inc. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Gulf Coast Solar Center II plant?

Gulf Coast Solar Center II is in Navarre, Santa Rosa County, Florida, at 30.4308° N, 86.8952° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Gulf Coast Solar Center II's 40 MW is 0% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Big Bend II SolarHillsborough4686,395
Lake Placid Solar Power PlantHighlands4572,837
FL Solar 4, LLCLeon4269,918
Gulf Coast Solar Center IISanta Rosa4078,781
Bonnie Mine SolarPolk3866,506
Gulf Coast Solar Center IOkaloosa3061,230
DeSoto Next Generation Solar EnergyDeSoto2530,459

Source: EIA Forms EIA-860 and EIA-923, 2025.