Skip to main content
RateWatt

Solar power plant, Florida

Lake Placid Solar Power Plant, Florida

Lake Placid Solar Power Plant is a 62.3 MW power plant, 45 MW of it solar, in Highlands County, Florida, operated by Duke Energy Florida, LLC, and it generated 72,651 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 18th percentile of U.S. solar plants. By 2025 generation it ranks 3,732nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

62.3 MWNameplate capacity
18%Capacity factor, 2025, solar units, 18th percentile, on 45 MW net summer
3,732ndU.S. rank by generation, 2025
5 yearsAverage generator age, by MW

How hard does Lake Placid Solar Power Plant run compared with other solar plants?

Lake Placid Solar Power Plant's solar units had a capacity factor of 18% in 2025 on 45 MW of net summer capacity, the 18th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 67 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Lake Placid Solar Power Plant18%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is Lake Placid Solar Power Plant generating more or less than last year?

Generation at Lake Placid Solar Power Plant rose 2.8% from 2024 to 2025, from 70,651 MWh to 72,651 MWh. Through August 2026 it is running 34.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202470,651
202572,651
2026 through August61,124
2025, same months45,483
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20265,299
July 20267,247
June 20268,135
May 20269,649
April 20269,808
March 20268,796
February 20267,104
January 20265,086
December 20256,390
November 20257,028
October 20258,135
September 20255,615
August 20258,085
July 20255,598
June 20255,335
May 20255,315
April 20257,101
March 20256,535
February 20254,072
January 20253,442
December 20242,048
November 20242,202
October 20242,390
September 20246,338
August 20247,722
July 20247,608
June 20247,277
May 20248,566
April 20249,097
March 20247,519
February 20246,364
January 20243,520

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from Lake Placid Solar Power Plant?

Lake Placid Solar Power Plant made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 222nd largest of 331 plants in Florida, the 3,476th largest of 14,327 in the U.S. and the 946th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 235th largest of 313 generating plants in the state.

Lake Placid Solar Power Plant within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)6279,9360.1%
Generation (MWh)72,651267,867,7350.0%
Solar capacity (MW)4512,2230.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Lake Placid Solar Power Plant, and when do they retire?

2 operable generators total 62.3 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s14572%none reported
2020s11728%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic452019n/a
ES1OperatingBatteries172023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Lake Placid Solar Power Plant?

EIA lists no joint owners for Lake Placid Solar Power Plant. Duke Energy Florida, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Florida, LLC charge homes?

Duke Energy Florida, LLC, the operator of Lake Placid Solar Power Plant, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Duke Energy Florida, LLC18.36¢$18521% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does Lake Placid Solar Power Plant use?

Lake Placid Solar Power Plant has capacity on 2 fuels: 72% solar and 28% battery and pumped storage. In 2025, solar made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar4572.2%72,837
Battery and pumped storage1727.8%-186

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is Lake Placid Solar Power Plant?

Lake Placid Solar Power Plant is in Lake Placid, Highlands County, Florida, at 27.3311° N, 81.3640° W. It sits in the Duke Energy Florida Inc balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Lake Placid Solar Power Plant's 45 MW is 0% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Gulf Coast Solar Center IIIEscambia5093,195
Lake Hancock SolarPolk5093,030
Big Bend II SolarHillsborough4686,395
Lake Placid Solar Power PlantHighlands4572,837
FL Solar 4, LLCLeon4269,918
Gulf Coast Solar Center IISanta Rosa4078,781
Bonnie Mine SolarPolk3866,506

Source: EIA Forms EIA-860 and EIA-923, 2025.