Cotton Center Solar Hybrid is a 34 MW power plant, 17 MW of it solar, in Maricopa County, Arizona, operated by Arizona Public Service Co, and it generated 29,432 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 39th percentile of U.S. solar plants. By 2025 generation it ranks 4,775th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

34 MWNameplate capacity
22%Capacity factor, 2025, solar units, 39th percentile, on 17 MW net summer
4,775thU.S. rank by generation, 2025
8 yearsAverage generator age, by MW

How hard does the Cotton Center Solar Hybrid plant run compared with other solar plants?

The Cotton Center Solar Hybrid plant's solar units had a capacity factor of 22% in 2025 on 17 MW of net summer capacity, the 39th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 80 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cotton Center Solar Hybrid22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Cotton Center Solar Hybrid plant generating more or less than last year?

Generation at Cotton Center Solar Hybrid fell 19.3% from 2024 to 2025, from 36,492 MWh to 29,432 MWh.

Net generation by period
PeriodMWh
202436,492
202529,432
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,590
November 20251,244
October 20251,737
September 20251,961
August 20253,403
July 20252,401
June 20253,238
May 20253,932
April 20253,478
March 20252,650
February 20251,895
January 20251,903
December 20241,329
November 20241,881
October 20242,505
September 20243,031
August 20243,491
July 20243,753
June 20243,970
May 20244,527
April 20244,131
March 20243,384
February 20242,526
January 20241,964

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Cotton Center Solar Hybrid plant?

Cotton Center Solar Hybrid made 0.0% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.1% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 106th largest of 191 plants in Arizona, the 4,261st largest of 14,327 in the U.S. and the 1,341st largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 109th largest of 167 generating plants in the state.

Cotton Center Solar Hybrid within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)3440,5140.1%
Generation (MWh)29,432115,800,3780.0%
Solar capacity (MW)176,6720.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Cotton Center Solar Hybrid plant, and when do they retire?

2 operable generators total 34 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s11750%none reported
2020s11750%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic172011n/a
CC17MOperatingBatteries172023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Cotton Center Solar Hybrid plant?

EIA lists no joint owners for Cotton Center Solar Hybrid. Arizona Public Service Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Arizona Public Service Co charge homes?

Arizona Public Service Co, the operator of Cotton Center Solar Hybrid, had an average residential price of 17.03¢ per kWh and an average bill of $165 a month in 2025, 12% above the Arizona average of 15.26¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Arizona
Arizona Public Service Co17.03¢$16512% higher
Arizona average15.26¢$157
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the Cotton Center Solar Hybrid plant use?

Cotton Center Solar Hybrid has capacity on 2 fuels: 50% solar and 50% battery and pumped storage. In 2025, solar made 110% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar1750.0%32,476
Battery and pumped storage1750.0%-3,044

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Cotton Center Solar Hybrid plant?

Cotton Center Solar Hybrid is in Gila Bend, Maricopa County, Arizona, at 33.0347° N, 112.6617° W. It sits in the Arizona Public Service Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Cotton Center Solar Hybrid's 17 MW is 0% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Queen Creek Solar FarmMaricopa1934,766
Fort Huachuca Solar PV ProjectCochise1834,826
Mohave Energy - HybridMohave1845,659
Cotton Center Solar HybridMaricopa1732,476
Paloma Solar HybridMaricopa1733,330
Avalon Solar IIPima1642,943
Saddle Mountain Solar IMaricopa1533,321

Source: EIA Forms EIA-860 and EIA-923, 2025.