Mohave Energy-Hybrid is a 32.6 MW power plant, 17.6 MW of it solar, in Mohave County, Arizona, operated by Mohave Energy, and it generated 45,659 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 89th percentile of U.S. solar plants. By 2025 generation it ranks 4,207th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

32.6 MWNameplate capacity
30%Capacity factor, 2025, solar units, 89th percentile, on 17.6 MW net summer
4,207thU.S. rank by generation, 2025
2 yearsAverage generator age, by MW

How hard does the Mohave Energy-Hybrid plant run compared with other solar plants?

The Mohave Energy-Hybrid plant's solar units had a capacity factor of 30% in 2025 on 17.6 MW of net summer capacity, the 89th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 108 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Mohave Energy-Hybrid30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Mohave Energy-Hybrid plant generating more or less than last year?

Mohave Energy-Hybrid generated 45,659 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 6.2% behind the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
202438,733
202545,659
2026 through August31,878
2025, same months33,973
Monthly generation, Feb 2024 to Aug 2026
MonthMWh
August 20264,189
July 20264,789
June 20265,139
May 20264,680
April 20264,142
March 20263,987
February 20262,496
January 20262,456
December 20251,873
November 20252,316
October 20253,657
September 20253,840
August 20254,365
July 20255,406
June 20255,097
May 20254,642
April 20255,008
March 20254,117
February 20252,999
January 20252,339
December 20241,869
November 20241,979
October 20243,134
September 20243,954
August 20244,639
July 20245,168
June 2024696
May 20245,597
April 20245,240
March 20244,129
February 20242,328

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Mohave Energy-Hybrid plant?

Mohave Energy-Hybrid made 0.0% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.1% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 108th largest of 191 plants in Arizona, the 4,290th largest of 14,327 in the U.S. and the 1,334th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 91st largest of 167 generating plants in the state.

Mohave Energy-Hybrid within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)3340,5140.1%
Generation (MWh)45,659115,800,3780.0%
Solar capacity (MW)186,6720.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Mohave Energy-Hybrid plant, and when do they retire?

2 operable generators total 32.6 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s233100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MEBAOperatingBatteries152023n/a
MEPVOperatingSolar Photovoltaic182023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Mohave Energy-Hybrid plant?

EIA lists no joint owners for Mohave Energy-Hybrid. Mohave Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Mohave Energy-Hybrid plant use?

Mohave Energy-Hybrid has capacity on 2 fuels: 54% solar and 46% battery and pumped storage. In 2025, solar made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar1854.0%45,659
Battery and pumped storage1546.0%0

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Mohave Energy-Hybrid plant?

Mohave Energy-Hybrid is in Fort Mohave, Mohave County, Arizona, at 34.9933° N, 114.5484° W. It sits in the Western Area Power Administration - Desert Southwest Region balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Mohave Energy-Hybrid's 17.6 MW is 0% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Chino Valley SolarYavapai1936,515
Queen Creek Solar FarmMaricopa1934,766
Fort Huachuca Solar PV ProjectCochise1834,826
Mohave Energy - HybridMohave1845,659
Cotton Center Solar HybridMaricopa1732,476
Paloma Solar HybridMaricopa1733,330
Avalon Solar IIPima1642,943

Source: EIA Forms EIA-860 and EIA-923, 2025.