Wind power plant, Iowa
Crystal Lake 3 LLC wind power plant, Iowa
Crystal Lake 3 LLC is a 66 MW wind power plant in Winnebago County, Iowa, operated by Crystal Lake 3 LLC, and it generated 236,622 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Iowa, and its capacity factor sits at the 76th percentile of U.S. wind plants. By 2025 generation it ranks 2,290th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Crystal Lake 3 LLC plant run compared with other wind plants?
The Crystal Lake 3 LLC plant had a capacity factor of 41% in 2025 on 66 MW of net summer capacity, the 76th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 149 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Crystal Lake 3 LLC | 41% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Crystal Lake 3 LLC plant generating more or less than last year?
Generation at Crystal Lake 3 LLC fell 4.2% from 2024 to 2025, from 246,991 MWh to 236,622 MWh. Through August 2026 it is running 2.4% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 246,991 |
| 2025 | 236,622 |
| 2026 through August | 150,553 |
| 2025, same months | 154,202 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 10,441 |
| July 2026 | 8,387 |
| June 2026 | 17,420 |
| May 2026 | 21,826 |
| April 2026 | 26,797 |
| March 2026 | 23,508 |
| February 2026 | 21,395 |
| January 2026 | 20,779 |
| December 2025 | 24,089 |
| November 2025 | 22,548 |
| October 2025 | 23,888 |
| September 2025 | 11,895 |
| August 2025 | 9,505 |
| July 2025 | 9,347 |
| June 2025 | 15,194 |
| May 2025 | 15,932 |
| April 2025 | 25,813 |
| March 2025 | 27,543 |
| February 2025 | 23,430 |
| January 2025 | 27,438 |
| December 2024 | 23,333 |
| November 2024 | 19,758 |
| October 2024 | 25,077 |
| September 2024 | 15,808 |
| August 2024 | 10,590 |
| July 2024 | 12,315 |
| June 2024 | 18,386 |
| May 2024 | 20,131 |
| April 2024 | 30,475 |
| March 2024 | 28,702 |
| February 2024 | 23,244 |
| January 2024 | 19,172 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Crystal Lake 3 LLC plant, and when do they retire?
1 operable generator totals 66 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 66 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GE1.5 | Operating | Onshore Wind Turbine | 66 | 2009 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Crystal Lake 3 LLC plant?
EIA lists no joint owners for Crystal Lake 3 LLC. Crystal Lake 3 LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Crystal Lake 3 LLC plant?
Crystal Lake 3 LLC is in Britt, Winnebago County, Iowa, at 43.3192° N, 93.8836° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Iowa are similar in size?
Iowa has 123 operable wind plants with 13,410 MW of capacity, and Crystal Lake 3 LLC's 66 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Pocahontas Prairie Wind Farm | Pocahontas | 80 | 373,500 |
| Sac County Wind, LLC | Sac | 80 | 321,002 |
| Kossuth County Wind | Kossuth | 70 | 283,176 |
| Crystal Lake 3 LLC | Winnebago | 66 | 236,622 |
| Saratoga Wind Farm | Howard | 66 | 270,154 |
| Independence Wind Farm | Delaware | 55 | 211,533 |
| Rippey Wind Farm | Greene | 50 | 166,619 |
Source: EIA Forms EIA-860 and EIA-923, 2025.