Saratoga Wind Farm is a 66 MW wind power plant in Howard County, Iowa, operated by Madison Gas & Electric Co, and it generated 270,154 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Iowa, and its capacity factor sits at the 95th percentile of U.S. wind plants. By 2025 generation it ranks 2,110th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

66 MWNameplate capacity
47%Capacity factor, 2025, 95th percentile, on 66 MW net summer
0.4%Of IA generation, 2025
6 yearsAverage generator age, by MW

How hard does the Saratoga Wind Farm plant run compared with other wind plants?

The Saratoga Wind Farm plant had a capacity factor of 47% in 2025 on 66 MW of net summer capacity, the 95th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 171 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Saratoga Wind Farm47%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Saratoga Wind Farm plant generating more or less than last year?

Generation at Saratoga Wind Farm fell 4.2% from 2024 to 2025, from 281,930 MWh to 270,154 MWh. Through August 2026 it is running 8.4% behind the same months of 2025.

Net generation by period
PeriodMWh
2024281,930
2025270,154
2026 through August161,301
2025, same months176,176
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,094
July 20269,417
June 202616,673
May 202623,292
April 202627,329
March 202626,185
February 202622,319
January 202622,992
December 202526,698
November 202525,394
October 202526,532
September 202515,354
August 202512,824
July 202512,822
June 202518,041
May 202520,121
April 202526,612
March 202528,382
February 202526,457
January 202530,917
December 202423,444
November 202427,147
October 202430,224
September 202419,218
August 202416,152
July 202412,472
June 202420,967
May 202422,848
April 202431,554
March 202430,606
February 202426,967
January 202420,331

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Saratoga Wind Farm plant?

Saratoga Wind Farm made 0.4% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.3% of the state's 24,817 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 99th largest of 306 plants in Iowa, the 3,413th largest of 14,327 in the U.S. and the 809th largest of 1,358 wind plants. By 2025 generation it is the 71st largest of 283 generating plants in the state.

Saratoga Wind Farm within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)6624,8170.3%
Generation (MWh)270,15474,502,3730.4%
Wind capacity (MW)6613,4100.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Saratoga Wind Farm plant, and when do they retire?

1 operable generator totals 66 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s166100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SWEOperatingOnshore Wind Turbine662019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Saratoga Wind Farm plant?

EIA lists no joint owners for Saratoga Wind Farm. Madison Gas & Electric Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Madison Gas & Electric Co charge homes?

Madison Gas & Electric Co, the operator of Saratoga Wind Farm, had an average residential price of 21.11¢ per kWh and an average bill of $107 a month in 2025 in Wisconsin.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Iowa
Madison Gas & Electric Co21.11¢$107other state
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Saratoga Wind Farm plant?

Saratoga Wind Farm is in Lime Springs, Howard County, Iowa, at 43.4489° N, 92.2807° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Saratoga Wind Farm's 66 MW is 0% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Sac County Wind, LLCSac80321,002
Kossuth County WindKossuth70283,176
Crystal Lake 3 LLCWinnebago66236,622
Saratoga Wind FarmHoward66270,154
Independence Wind FarmDelaware55211,533
Rippey Wind FarmGreene50166,619
Osceola Windpower IIOsceola50200,272