Skip to main content
RateWatt

Wind power plant, Iowa

Osceola Windpower II wind power plant, Iowa

Osceola Windpower II is a 49.6 MW wind power plant in Osceola County, Iowa, operated by Osceola Windpower II, and it generated 200,272 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Iowa, and its capacity factor sits at the 93rd percentile of U.S. wind plants. By 2025 generation it ranks 2,488th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

49.6 MWNameplate capacity
46%Capacity factor, 2025, 93rd percentile, on 49.6 MW net summer
0.3%Of IA generation, 2025
17 yearsAverage generator age, by MW

How hard does the Osceola Windpower II plant run compared with other wind plants?

The Osceola Windpower II plant had a capacity factor of 46% in 2025 on 49.6 MW of net summer capacity, the 93rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 168 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Osceola Windpower II46%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Osceola Windpower II plant generating more or less than last year?

Generation at Osceola Windpower II fell 0.4% from 2024 to 2025, from 200,999 MWh to 200,272 MWh. Through August 2026 it is running 6.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024200,999
2025200,272
2026 through August123,195
2025, same months131,909
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20269,147
July 20268,311
June 202613,727
May 202616,023
April 202620,153
March 202621,318
February 202617,001
January 202617,515
December 202519,691
November 202517,683
October 202520,519
September 202510,470
August 20258,293
July 20259,058
June 202513,439
May 202514,943
April 202521,765
March 202523,040
February 202519,242
January 202522,129
December 202416,227
November 202417,805
October 202420,527
September 202414,659
August 202410,280
July 20249,417
June 202415,433
May 202417,687
April 202424,804
March 202423,112
February 202416,649
January 202414,399

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Osceola Windpower II plant?

Osceola Windpower II made 0.3% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.2% of the state's 24,817 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 107th largest of 306 plants in Iowa, the 3,855th largest of 14,327 in the U.S. and the 885th largest of 1,358 wind plants. By 2025 generation it is the 84th largest of 283 generating plants in the state.

Osceola Windpower II within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)5024,8170.2%
Generation (MWh)200,27274,502,3730.3%
Wind capacity (MW)5013,4100.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Osceola Windpower II plant, and when do they retire?

1 operable generator totals 49.6 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CL25OperatingOnshore Wind Turbine502008n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Osceola Windpower II plant?

EIA lists no joint owners for Osceola Windpower II. Osceola Windpower II operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Osceola Windpower II plant?

Osceola Windpower II is in Harris, Osceola County, Iowa, at 43.4303° N, 95.4167° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Osceola Windpower II's 49.6 MW is 0% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Saratoga Wind FarmHoward66270,154
Independence Wind FarmDelaware55211,533
Rippey Wind FarmGreene50166,619
Osceola Windpower IIOsceola50200,272
Flying Cloud Power Partners LLCDickinson4498,053
Hawkeye Power Partners LLCCerro Gordo42167,792
Cerro Gordo Wind FarmCerro Gordo42167,792

Source: EIA Forms EIA-860 and EIA-923, 2025.