Wind power plant, Iowa

Hawkeye Power Partners LLC wind power plant, Iowa

Hawkeye Power Partners LLC is a 42 MW wind power plant in Cerro Gordo County, Iowa, operated by Hawkeye Power Partners LLC, and it generated 167,792 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Iowa, and its capacity factor sits at the 93rd percentile of U.S. wind plants. By 2025 generation it ranks 2,736th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

42 MWNameplate capacity
46%Capacity factor, 2025, 93rd percentile, on 42 MW net summer
0.2%Of IA generation, 2025
26 yearsAverage generator age, by MW

How hard does the Hawkeye Power Partners LLC plant run compared with other wind plants?

The Hawkeye Power Partners LLC plant had a capacity factor of 46% in 2025 on 42 MW of net summer capacity, the 93rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 166 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hawkeye Power Partners LLC46%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hawkeye Power Partners LLC plant generating more or less than last year?

Generation at Hawkeye Power Partners LLC fell 4.7% from 2024 to 2025, from 176,054 MWh to 167,792 MWh.

Net generation by period
PeriodMWh
2024176,054
2025167,792
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202517,374
November 202516,466
October 202517,605
September 20259,375
August 20257,582
July 20256,832
June 202510,787
May 202512,271
April 202517,791
March 202519,805
February 202515,371
January 202516,533
December 202412,697
November 202416,603
October 202419,367
September 202412,153
August 20249,535
July 20247,836
June 202413,842
May 202414,533
April 202420,194
March 202419,336
February 202417,101
January 202412,857

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Hawkeye Power Partners LLC plant?

Hawkeye Power Partners LLC made 0.2% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.2% of the state's 24,817 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 110th largest of 306 plants in Iowa, the 4,033rd largest of 14,327 in the U.S. and the 909th largest of 1,358 wind plants. By 2025 generation it is the 88th largest of 283 generating plants in the state.

Hawkeye Power Partners LLC within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)4224,8170.2%
Generation (MWh)167,79274,502,3730.2%
Wind capacity (MW)4213,4100.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hawkeye Power Partners LLC plant, and when do they retire?

1 operable generator totals 42 MW, with an average age of 26 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s142100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
48MOperatingOnshore Wind Turbine421999n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hawkeye Power Partners LLC plant?

Shaw Creek Solar is the only joint owner reported for Hawkeye Power Partners LLC, with 100.0%. Hawkeye Power Partners LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hawkeye Power Partners LLC plant?

Hawkeye Power Partners LLC is in Garner, Cerro Gordo County, Iowa, at 43.0472° N, 93.4775° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Hawkeye Power Partners LLC's 42 MW is 0% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Rippey Wind FarmGreene50166,619
Osceola Windpower IIOsceola50200,272
Flying Cloud Power Partners LLCDickinson4498,053
Hawkeye Power Partners LLCCerro Gordo42167,792
Cerro Gordo Wind FarmCerro Gordo42167,792
Elk Wind FarmDelaware41172,892
Prescott Wind FarmAdams39141,846