Skip to main content
RateWatt

Wind power plant, Iowa

Prescott Wind Farm, Iowa

Prescott Wind Farm is a 38.7 MW wind power plant in Adams County, Iowa, operated by Prescott Wind Energy LLC, and it generated 141,846 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Iowa, and its capacity factor sits at the 81st percentile of U.S. wind plants. By 2025 generation it ranks 2,992nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

38.7 MWNameplate capacity
42%Capacity factor, 2025, 81st percentile, on 38.7 MW net summer
0.2%Of IA generation, 2025
1 yearAverage generator age, by MW

How hard does the Prescott Wind Farm plant run compared with other wind plants?

The Prescott Wind Farm plant had a capacity factor of 42% in 2025 on 38.7 MW of net summer capacity, the 81st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 153 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Prescott Wind Farm42%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Prescott Wind Farm plant generating more or less than last year?

Prescott Wind Farm generated 141,846 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 29.7% ahead of the same months of 2025. 2024 has output for only 4 months, so the two years are not compared.

Net generation by period
PeriodMWh
202451,943
2025141,846
2026 through August122,945
2025, same months94,781
Monthly generation, Sep 2024 to Aug 2026
MonthMWh
August 20268,915
July 20268,921
June 202613,449
May 202615,468
April 202623,901
March 202623,466
February 202615,757
January 202613,068
December 202514,135
November 202512,468
October 202513,118
September 20257,344
August 20257,080
July 20257,103
June 20259,084
May 202510,154
April 202515,827
March 202516,738
February 202513,781
January 202515,014
December 202413,589
November 202413,327
October 202415,006
September 202410,021

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Prescott Wind Farm plant?

Prescott Wind Farm made 0.2% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.2% of the state's 24,817 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 117th largest of 306 plants in Iowa, the 4,152nd largest of 14,327 in the U.S. and the 927th largest of 1,358 wind plants. By 2025 generation it is the 91st largest of 283 generating plants in the state.

Prescott Wind Farm within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)3924,8170.2%
Generation (MWh)141,84674,502,3730.2%
Wind capacity (MW)3913,4100.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Prescott Wind Farm plant, and when do they retire?

1 operable generator totals 38.7 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s139100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PWEOperatingOnshore Wind Turbine392024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Prescott Wind Farm plant?

EIA lists no joint owners for Prescott Wind Farm. Prescott Wind Energy LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Prescott Wind Farm plant?

Prescott Wind Farm is in Prescott, Adams County, Iowa, at 41.1210° N, 94.6051° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Prescott Wind Farm's 38.7 MW is 0% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Hawkeye Power Partners LLCCerro Gordo42167,792
Cerro Gordo Wind FarmCerro Gordo42167,792
Elk Wind FarmDelaware41172,892
Prescott Wind FarmAdams39141,846
Hawkeye Wind FarmBremer35170,574
Top of Iowa Windfarm IIIWorth3039,939
Crosswind Energy ProjectPalo Alto2157,373

Source: EIA Forms EIA-860 and EIA-923, 2025.