Hawkeye Wind Farm, Iowa

Hawkeye Wind Farm is a 35 MW wind power plant in Bremer County, Iowa, operated by Greenbacker Renewable Energy Corporation, and it generated 170,574 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Iowa, and its capacity factor sits at the 100th percentile of U.S. wind plants. By 2025 generation it ranks 2,715th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

35 MWNameplate capacity
57%Capacity factor, 2025, 100th percentile, on 34 MW net summer
0.2%Of IA generation, 2025
13 yearsAverage generator age, by MW

How hard does the Hawkeye Wind Farm plant run compared with other wind plants?

The Hawkeye Wind Farm plant had a capacity factor of 57% in 2025 on 34 MW of net summer capacity, the 100th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 209 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hawkeye Wind Farm57%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hawkeye Wind Farm plant generating more or less than last year?

Generation at Hawkeye Wind Farm fell 1.6% from 2024 to 2025, from 173,276 MWh to 170,574 MWh.

Net generation by period
PeriodMWh
2024173,276
2025170,574
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202517,307
November 202516,047
October 202517,628
September 202510,294
August 20258,736
July 20257,373
June 202511,841
May 202512,401
April 202515,937
March 202519,444
February 202515,429
January 202518,137
December 202414,333
November 202415,071
October 202418,261
September 202413,168
August 202411,113
July 20248,115
June 202414,118
May 202413,419
April 202418,320
March 202418,752
February 202416,003
January 202412,603

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Hawkeye Wind Farm plant?

Hawkeye Wind Farm made 0.2% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.1% of the state's 24,817 MW of capacity. Its share of output is 1.6 times its share of capacity. By capacity it is the 119th largest of 306 plants in Iowa, the 4,234th largest of 14,327 in the U.S. and the 937th largest of 1,358 wind plants. By 2025 generation it is the 87th largest of 283 generating plants in the state.

Hawkeye Wind Farm within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)3524,8170.1%
Generation (MWh)170,57474,502,3730.2%
Wind capacity (MW)3513,4100.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hawkeye Wind Farm plant, and when do they retire?

1 operable generator totals 35 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s135100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
NORDOperatingOnshore Wind Turbine352012n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hawkeye Wind Farm plant?

2 owners report shares in Hawkeye Wind Farm; RPG Elk/Hawkeye Investco, LLC holds the largest named share, 90.0% or about 31.5 MW. Greenbacker Renewable Energy Corporation operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
RPG Elk/Hawkeye Investco, LLC90.0%32153,517
RPMA Wind Holding II10.0%417,057

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Hawkeye Wind Farm plant?

Hawkeye Wind Farm is in Sumner, Bremer County, Iowa, at 42.9489° N, 92.0622° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Hawkeye Wind Farm's 35 MW is 0% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Cerro Gordo Wind FarmCerro Gordo42167,792
Elk Wind FarmDelaware41172,892
Prescott Wind FarmAdams39141,846
Hawkeye Wind FarmBremer35170,574
Top of Iowa Windfarm IIIWorth3039,939
Crosswind Energy ProjectPalo Alto2157,373
Carroll Area Wind FarmCarroll2153,820

Source: EIA Forms EIA-860 and EIA-923, 2025.