Skip to main content
RateWatt

Wind power plant, Iowa

Top of Iowa Windfarm III wind power plant, Iowa

Top of Iowa Windfarm III is a 29.7 MW wind power plant in Worth County, Iowa, operated by Madison Gas & Electric Co, and it generated 39,939 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Iowa, and its capacity factor sits at the 5th percentile of U.S. wind plants. By 2025 generation it ranks 4,365th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

29.7 MWNameplate capacity
15%Capacity factor, 2025, 5th percentile, on 29.7 MW net summer
0.1%Of IA generation, 2025
17 yearsAverage generator age, by MW

How hard does the Top of Iowa Windfarm III plant run compared with other wind plants?

The Top of Iowa Windfarm III plant had a capacity factor of 15% in 2025 on 29.7 MW of net summer capacity, the 5th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 56 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Top of Iowa Windfarm III15%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Top of Iowa Windfarm III plant generating more or less than last year?

Generation at Top of Iowa Windfarm III fell 8.8% from 2024 to 2025, from 43,805 MWh to 39,939 MWh.

Net generation by period
PeriodMWh
202443,805
202539,939
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20254,755
November 20253,776
October 20254,180
September 20252,224
August 20251,994
July 20251,911
June 20252,368
May 20251,913
April 20254,009
March 20254,682
February 20253,866
January 20254,261
December 20245,207
November 20243,996
October 20244,366
September 20243,237
August 20243,195
July 20242,567
June 20243,425
May 20243,056
April 20243,468
March 20243,782
February 20244,169
January 20243,337

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Top of Iowa Windfarm III plant?

Top of Iowa Windfarm III made 0.1% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.1% of the state's 24,817 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 120th largest of 306 plants in Iowa, the 4,418th largest of 14,327 in the U.S. and the 963rd largest of 1,358 wind plants. By 2025 generation it is the 111th largest of 283 generating plants in the state.

Top of Iowa Windfarm III within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)3024,8170.1%
Generation (MWh)39,93974,502,3730.1%
Wind capacity (MW)3013,4100.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Top of Iowa Windfarm III plant, and when do they retire?

1 operable generator totals 29.7 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s130100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TOI3OperatingOnshore Wind Turbine302008n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Top of Iowa Windfarm III plant?

EIA lists no joint owners for Top of Iowa Windfarm III. Madison Gas & Electric Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Madison Gas & Electric Co charge homes?

Madison Gas & Electric Co, the operator of Top of Iowa Windfarm III, had an average residential price of 21.11¢ per kWh and an average bill of $107 a month in 2025 in Wisconsin.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Iowa
Madison Gas & Electric Co21.11¢$107other state
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Top of Iowa Windfarm III plant?

Top of Iowa Windfarm III is in Kensett, Worth County, Iowa, at 43.3597° N, 93.3208° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Top of Iowa Windfarm III's 29.7 MW is 0% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Elk Wind FarmDelaware41172,892
Prescott Wind FarmAdams39141,846
Hawkeye Wind FarmBremer35170,574
Top of Iowa Windfarm IIIWorth3039,939
Crosswind Energy ProjectPalo Alto2157,373
Carroll Area Wind FarmCarroll2153,820
Winnebago Wind Power ProjectWinnebago2061,332

Source: EIA Forms EIA-860 and EIA-923, 2025.