Wind power plant, Iowa
Carroll Area Wind Farm, Iowa
Carroll Area Wind Farm is a 20.7 MW wind power plant in Carroll County, Iowa, operated by SRIV Partnership LLC, and it generated 53,820 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Iowa, and its capacity factor sits at the 37th percentile of U.S. wind plants. By 2025 generation it ranks 4,004th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Carroll Area Wind Farm plant run compared with other wind plants?
The Carroll Area Wind Farm plant had a capacity factor of 30% in 2025 on 20.7 MW of net summer capacity, the 37th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 108 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Carroll Area Wind Farm | 30% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Carroll Area Wind Farm plant generating more or less than last year?
Generation at Carroll Area Wind Farm held level from 2024 to 2025, from 53,845 MWh to 53,820 MWh.
| Period | MWh |
|---|---|
| 2024 | 53,845 |
| 2025 | 53,820 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 5,537 |
| November 2025 | 4,834 |
| October 2025 | 4,276 |
| September 2025 | 2,843 |
| August 2025 | 1,822 |
| July 2025 | 2,504 |
| June 2025 | 2,719 |
| May 2025 | 3,466 |
| April 2025 | 5,784 |
| March 2025 | 7,265 |
| February 2025 | 6,059 |
| January 2025 | 6,711 |
| December 2024 | 4,192 |
| November 2024 | 1,617 |
| October 2024 | 4,201 |
| September 2024 | 3,655 |
| August 2024 | 3,219 |
| July 2024 | 2,872 |
| June 2024 | 3,703 |
| May 2024 | 5,473 |
| April 2024 | 6,880 |
| March 2024 | 6,077 |
| February 2024 | 6,668 |
| January 2024 | 5,288 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Carroll Area Wind Farm plant, and when do they retire?
1 operable generator totals 20.7 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 21 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WT 1 | Operating | Onshore Wind Turbine | 21 | 2015 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Carroll Area Wind Farm plant?
EIA lists no joint owners for Carroll Area Wind Farm. SRIV Partnership LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Carroll Area Wind Farm plant?
Carroll Area Wind Farm is in Templeton, Carroll County, Iowa, at 41.9414° N, 94.8861° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Iowa are similar in size?
Iowa has 123 operable wind plants with 13,410 MW of capacity, and Carroll Area Wind Farm's 20.7 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Hawkeye Wind Farm | Bremer | 35 | 170,574 |
| Top of Iowa Windfarm III | Worth | 30 | 39,939 |
| Crosswind Energy Project | Palo Alto | 21 | 57,373 |
| Carroll Area Wind Farm | Carroll | 21 | 53,820 |
| Winnebago Wind Power Project | Winnebago | 20 | 61,332 |
| Hardin Hilltop Wind LLC | Greene | 15 | 31,223 |
| Lakota Wind Wind Farm | Kossuth | 11 | 33,531 |
Source: EIA Forms EIA-860 and EIA-923, 2025.