Dempsey Ridge Wind Farm is a 132 MW wind power plant in Roger Mills County, Oklahoma, operated by Acciona Wind Energy USA LLC, and it generated 118,282 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Oklahoma, and its capacity factor sits at the 3rd percentile of U.S. wind plants. By 2025 generation it ranks 3,216th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Dempsey Ridge Wind Farm plant run compared with other wind plants?
The Dempsey Ridge Wind Farm plant had a capacity factor of 10% in 2025 on 132 MW of net summer capacity, the 3rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 37 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Dempsey Ridge Wind Farm | 10% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Dempsey Ridge Wind Farm plant generating more or less than last year?
Generation at Dempsey Ridge Wind Farm rose 1.5% from 2024 to 2025, from 116,503 MWh to 118,282 MWh.
| Period | MWh |
|---|---|
| 2024 | 116,503 |
| 2025 | 118,282 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 15,498 |
| November 2025 | 12,322 |
| October 2025 | 10,154 |
| September 2025 | 8,496 |
| August 2025 | 8,474 |
| July 2025 | 11,598 |
| June 2025 | 10,726 |
| May 2025 | 7,795 |
| April 2025 | 7,719 |
| March 2025 | 9,225 |
| February 2025 | 7,165 |
| January 2025 | 9,110 |
| December 2024 | 5,743 |
| November 2024 | 6,016 |
| October 2024 | 11,583 |
| September 2024 | 12,034 |
| August 2024 | 14,119 |
| July 2024 | 13,441 |
| June 2024 | 9,751 |
| May 2024 | 7,098 |
| April 2024 | 6,389 |
| March 2024 | 6,801 |
| February 2024 | 11,472 |
| January 2024 | 12,056 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Dempsey Ridge Wind Farm plant, and when do they retire?
1 operable generator totals 132 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 132 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| DR | Operating | Onshore Wind Turbine | 132 | 2012 | n/a |
| DR2 | Cancelled | Onshore Wind Turbine | 92 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Dempsey Ridge Wind Farm plant?
EIA lists no joint owners for Dempsey Ridge Wind Farm. Acciona Wind Energy USA LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Dempsey Ridge Wind Farm plant?
Dempsey Ridge Wind Farm is in Cheyenne, Roger Mills County, Oklahoma, at 35.5298° N, 99.8145° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Oklahoma are similar in size?
Oklahoma has 69 operable wind plants with 13,344 MW of capacity, and Dempsey Ridge Wind Farm's 132 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Grant Plains Wind, LLC | Grant | 147 | 473,393 |
| Weatherford Wind Energy Center | Custer | 147 | 610,093 |
| Rockhaven Wind Project, LLC | Murray | 140 | 470,107 |
| Dempsey Ridge Wind Farm | Roger Mills | 132 | 118,282 |
| Taloga Wind LLC | Dewey | 130 | 188,185 |
| Minco Wind IV, LLC | Canadian | 130 | 516,942 |
| Red Hills Wind Project LLC | Roger Mills | 123 | 190,222 |