Skip to main content
RateWatt

Wind power plant, Oklahoma

Drift Sand Wind Project LLC power plant, Oklahoma

Drift Sand Wind Project LLC is a 108 MW wind power plant in Grady County, Oklahoma, operated by Enel Green Power NA, Inc., and it generated 344,106 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Oklahoma, and its capacity factor sits at the 61st percentile of U.S. wind plants. By 2025 generation it ranks 1,798th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

108 MWNameplate capacity
36%Capacity factor, 2025, 61st percentile, on 108 MW net summer
0.4%Of OK generation, 2025
9 yearsAverage generator age, by MW

How hard does the Drift Sand Wind Project LLC plant run compared with other wind plants?

The Drift Sand Wind Project LLC plant had a capacity factor of 36% in 2025 on 108 MW of net summer capacity, the 61st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 133 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Drift Sand Wind Project LLC36%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Drift Sand Wind Project LLC plant generating more or less than last year?

Generation at Drift Sand Wind Project LLC fell 10.8% from 2024 to 2025, from 385,761 MWh to 344,106 MWh. Through August 2026 it is running 8.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024385,761
2025344,106
2026 through August241,572
2025, same months222,894
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202615,358
July 202628,347
June 202631,451
May 202627,492
April 202642,317
March 202641,955
February 202631,244
January 202623,408
December 202536,987
November 202534,316
October 202530,042
September 202519,867
August 202519,265
July 202522,936
June 202527,287
May 202522,301
April 202532,704
March 202541,345
February 202527,529
January 202529,527
December 202432,022
November 202430,236
October 202436,703
September 202416,743
August 202430,253
July 202430,233
June 202430,899
May 202428,943
April 202442,877
March 202443,308
February 202442,402
January 202421,142

Source: EIA Form EIA-923, through August 2026.

How much of Oklahoma's electricity comes from the Drift Sand Wind Project LLC plant?

Drift Sand Wind Project LLC made 0.4% of the 89,758,877 MWh reported by Oklahoma plants in 2025, from 0.3% of the state's 35,828 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 83rd largest of 143 plants in Oklahoma, the 2,462nd largest of 14,327 in the U.S. and the 598th largest of 1,358 wind plants. By 2025 generation it is the 70th largest of 135 generating plants in the state.

Drift Sand Wind Project LLC within Oklahoma, 2025
MeasureThis plantOklahomaShare
Capacity (MW)10835,8280.3%
Generation (MWh)344,10689,758,8770.4%
Wind capacity (MW)10813,3440.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Drift Sand Wind Project LLC plant, and when do they retire?

1 operable generator totals 108 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1108100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WT1OperatingOnshore Wind Turbine1082016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Drift Sand Wind Project LLC plant?

EIA lists no joint owners for Drift Sand Wind Project LLC. Enel Green Power NA, Inc. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Drift Sand Wind Project LLC plant?

Drift Sand Wind Project LLC is in Rush Springs, Grady County, Oklahoma, at 34.8278° N, 97.9572° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Oklahoma are similar in size?

Oklahoma has 69 operable wind plants with 13,344 MW of capacity, and Drift Sand Wind Project LLC's 108 MW is 1% of that.

Wind plants in Oklahoma around this size
PlantCountyMW2025 MWh
Red Hills Wind Project LLCRoger Mills123190,222
Centennial Wind FarmHarper120156,716
Glass Sands Wind FacilityMurray117420,520
Drift Sand Wind Project LLCGrady108344,106
Oklahoma Wind Energy CenterWoodward102140,563
OU Spirit Wind FarmWoodward101127,120
Minco Wind II, LLCGrady101323,079

Source: EIA Forms EIA-860 and EIA-923, 2025.