Edge Moor natural gas power plant, Delaware

Edge Moor is a 710 MW power plant, 698 MW of it natural gas, in New Castle County, Delaware, operated by Calpine Mid-Atlantic Generation LLC, and it generated 391,344 MWh in 2025 (Forms EIA-860 and EIA-923). That is 7.2% of the generation reported in Delaware, and its capacity factor sits at the 27th percentile of U.S. natural gas plants. By 2025 generation it ranks 1,614th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

710 MWNameplate capacity
6%Capacity factor, 2025, natural gas units, 27th percentile, on 695 MW net summer
7.2%Of DE generation, 2025
56 yearsAverage generator age, by MW

How hard does the Edge Moor plant run compared with other natural gas plants?

The Edge Moor plant's natural gas units had a capacity factor of 6% in 2025 on 695 MW of net summer capacity, the 27th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 23 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Edge Moor6%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.

Is the Edge Moor plant generating more or less than last year?

Edge Moor generated 391,344 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 9 months, so the two years are not compared.

4 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
2024327,562
2025391,344
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202516,308
November 202524,002
October 202566,486
September 202526,458
August 202530,770
July 2025114,220
June 202546,851
May 20251,406
April 20259,113
March 2025-872
February 202514,324
January 202542,278
December 20248,338
November 20248,110
October 2024-1,551
September 20242,113
August 202452,637
July 2024124,180
June 202485,251
May 202410,885
April 20244,956
March 2024-1,943
February 2024-1,898
January 202436,485

Source: EIA Form EIA-923, through August 2026.

How much of Delaware's electricity comes from the Edge Moor plant?

Edge Moor made 7.2% of the 5,451,407 MWh reported by Delaware plants in 2025, from 23.5% of the state's 3,020 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 2nd largest of 38 plants in Delaware, the 480th largest of 14,327 in the U.S. and the 285th largest of 1,962 natural gas plants on its natural gas units alone. By 2025 generation it is the 4th largest of 32 generating plants in the state.

Edge Moor within Delaware, 2025
MeasureThis plantDelawareShare
Capacity (MW)7103,02023.5%
Generation (MWh)391,3445,451,4077.2%
Natural gas capacity (MW)6982,62926.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Edge Moor plant, and when do they retire?

4 operable generators total 710 MW, with an average age of 56 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s17511%none reported
1960s218927%none reported
1970s144663%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
3OperatingNatural Gas Steam Turbine751954n/a
10On standbyPetroleum Liquids131963n/a
4OperatingNatural Gas Steam Turbine1771966n/a
5OperatingNatural Gas Steam Turbine4461973n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Edge Moor plant?

EIA lists no joint owners for Edge Moor. Calpine Mid-Atlantic Generation LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Edge Moor plant use?

Edge Moor has capacity on 2 fuels: 98% natural gas and 2% petroleum. In 2025, natural gas made 99% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Natural gas69898.2%388,231
Petroleum131.8%3,113

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Edge Moor plant?

Edge Moor is in Wilmington, New Castle County, Delaware, at 39.7389° N, 75.5038° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Delaware are similar in size?

Delaware has 10 operable natural gas plants with 2,629 MW of capacity, and Edge Moor's 698 MW is 27% of that.

Natural gas plants in Delaware around this size
PlantCountyMW2025 MWh
Hay RoadNew Castle1,0982,140,402
Edge MoorNew Castle698388,231
Garrison Energy Center LLCKent361836,961