Natural gas power plant, Delaware
Garrison Energy Center LLC natural gas power plant, Delaware
Garrison Energy Center LLC is a 361 MW natural gas power plant in Kent County, Delaware, operated by Garrison Energy Center LLC, and it generated 855,452 MWh in 2025 (Forms EIA-860 and EIA-923). That is 15.7% of the generation reported in Delaware, and its capacity factor sits at the 58th percentile of U.S. natural gas plants. By 2025 generation it ranks 830th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Garrison Energy Center LLC plant run compared with other natural gas plants?
The Garrison Energy Center LLC plant had a capacity factor of 31% in 2025 on 309 MW of net summer capacity, the 58th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 113 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Garrison Energy Center LLC | 31% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Garrison Energy Center LLC plant generating more or less than last year?
Generation at Garrison Energy Center LLC rose 7.7% from 2024 to 2025, from 794,620 MWh to 855,452 MWh. Through August 2026 it is running 30.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 794,620 |
| 2025 | 855,452 |
| 2026 through August | 615,265 |
| 2025, same months | 470,231 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 91,548 |
| July 2026 | 110,141 |
| June 2026 | 71,104 |
| May 2026 | 48,450 |
| April 2026 | 104,313 |
| March 2026 | 31,512 |
| February 2026 | 105,792 |
| January 2026 | 52,405 |
| December 2025 | 119,315 |
| November 2025 | 120,014 |
| October 2025 | 95,201 |
| September 2025 | 50,691 |
| August 2025 | 59,964 |
| July 2025 | 119,353 |
| June 2025 | 60,844 |
| May 2025 | 24,694 |
| April 2025 | 88,151 |
| March 2025 | 14,950 |
| February 2025 | 50,972 |
| January 2025 | 51,303 |
| December 2024 | 51,014 |
| November 2024 | 41,741 |
| October 2024 | 74,154 |
| September 2024 | 69,810 |
| August 2024 | 72,847 |
| July 2024 | 135,521 |
| June 2024 | 84,492 |
| May 2024 | 33,059 |
| April 2024 | 77,537 |
| March 2024 | 24,957 |
| February 2024 | 58,029 |
| January 2024 | 71,459 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Garrison Energy Center LLC plant, and when do they retire?
2 operable generators total 361 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 2 | 361 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CTG1 | Operating | Natural Gas Fired Combined Cycle | 235 | 2015 | n/a |
| STG2 | Operating | Natural Gas Fired Combined Cycle | 126 | 2015 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Garrison Energy Center LLC plant?
Cobalt Power, L.L.C. is the only joint owner reported for Garrison Energy Center LLC, with 100.0%. Garrison Energy Center LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Garrison Energy Center LLC plant?
Garrison Energy Center LLC is in Dover, Kent County, Delaware, at 39.1872° N, 75.4994° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Delaware are similar in size?
Delaware has 10 operable natural gas plants with 2,629 MW of capacity, and Garrison Energy Center LLC's 361 MW is 14% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Edge Moor | New Castle | 698 | 388,231 |
| Garrison Energy Center LLC | Kent | 361 | 836,961 |
| Delaware City Plant | New Castle | 184 | 927,927 |
Source: EIA Forms EIA-860 and EIA-923, 2025.