Solar power plant, Illinois
Eldorado Solar I power plant, Illinois
Eldorado Solar I is a 150 MW solar power plant in Saline County, Illinois, operated by Sol Systems, and it generated 308,348 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Illinois, and its capacity factor sits at the 53rd percentile of U.S. solar plants. By 2025 generation it ranks 1,938th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Eldorado Solar I plant run compared with other solar plants?
The Eldorado Solar I plant had a capacity factor of 23% in 2025 on 150 MW of net summer capacity, the 53rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 86 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Eldorado Solar I | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Eldorado Solar I plant generating more or less than last year?
Eldorado Solar I generated 308,348 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 1.9% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 308,348 |
| 2026 through August | 232,631 |
| 2025, same months | 228,299 |
Monthly generation, Jan 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 34,988 |
| July 2026 | 34,585 |
| June 2026 | 38,798 |
| May 2026 | 33,208 |
| April 2026 | 26,189 |
| March 2026 | 26,776 |
| February 2026 | 19,821 |
| January 2026 | 18,266 |
| December 2025 | 11,935 |
| November 2025 | 14,825 |
| October 2025 | 24,589 |
| September 2025 | 28,700 |
| August 2025 | 39,103 |
| July 2025 | 37,986 |
| June 2025 | 35,994 |
| May 2025 | 32,729 |
| April 2025 | 29,121 |
| March 2025 | 26,825 |
| February 2025 | 19,440 |
| January 2025 | 7,101 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Eldorado Solar I plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ELD15 | Operating | Solar Photovoltaic | 150 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Eldorado Solar I plant?
EIA lists no joint owners for Eldorado Solar I. Sol Systems operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Eldorado Solar I plant?
Eldorado Solar I is in Eldorado, Saline County, Illinois, at 37.8526° N, 88.4491° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Illinois are similar in size?
Illinois has 406 operable solar plants with 4,387 MW of capacity, and Eldorado Solar I's 150 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Maple Flats | Clay | 250 | 493,105 |
| Prairie Wolf Solar LLC | Coles | 200 | 379,636 |
| River Ferry Solar 1 | Clark | 165 | 304,116 |
| Eldorado Solar I | Saline | 150 | 308,348 |
| Boomtown Renewable Energy Center | White | 150 | 286,304 |
| Cass County Renewable Energy Center | Cass | 150 | 331,772 |
| Pleasantville Solar Park | Fulton | 150 | 48,205 |
Source: EIA Forms EIA-860 and EIA-923, 2025.