Solar power plant, Illinois
River Ferry Solar 1 power plant, Illinois
River Ferry Solar 1 is a 165 MW solar power plant in Clark County, Illinois, operated by River Ferry Solar 1, LLC, and it generated 304,116 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Illinois, and its capacity factor sits at the 27th percentile of U.S. solar plants. By 2025 generation it ranks 1,953rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the River Ferry Solar 1 plant run compared with other solar plants?
The River Ferry Solar 1 plant had a capacity factor of 20% in 2025 on 172 MW of net summer capacity, the 27th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 74 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| River Ferry Solar 1 | 20% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the River Ferry Solar 1 plant generating more or less than last year?
Generation at River Ferry Solar 1 rose 6.0% from 2024 to 2025, from 287,032 MWh to 304,116 MWh. Through August 2026 it is running 9.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 287,032 |
| 2025 | 304,116 |
| 2026 through August | 237,520 |
| 2025, same months | 217,416 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 35,608 |
| July 2026 | 38,659 |
| June 2026 | 36,177 |
| May 2026 | 34,068 |
| April 2026 | 30,646 |
| March 2026 | 25,311 |
| February 2026 | 19,811 |
| January 2026 | 17,240 |
| December 2025 | 11,605 |
| November 2025 | 15,000 |
| October 2025 | 25,118 |
| September 2025 | 34,977 |
| August 2025 | 39,435 |
| July 2025 | 24,745 |
| June 2025 | 31,157 |
| May 2025 | 31,943 |
| April 2025 | 26,438 |
| March 2025 | 25,396 |
| February 2025 | 19,355 |
| January 2025 | 18,947 |
| December 2024 | 10,088 |
| November 2024 | 12,230 |
| October 2024 | 28,964 |
| September 2024 | 27,577 |
| August 2024 | 33,525 |
| July 2024 | 30,876 |
| June 2024 | 28,606 |
| May 2024 | 34,206 |
| April 2024 | 25,657 |
| March 2024 | 25,243 |
| February 2024 | 19,861 |
| January 2024 | 10,199 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the River Ferry Solar 1 plant, and when do they retire?
1 operable generator totals 165 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 165 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| RVFRY | Operating | Solar Photovoltaic | 165 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the River Ferry Solar 1 plant?
EIA lists no joint owners for River Ferry Solar 1. River Ferry Solar 1, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the River Ferry Solar 1 plant?
River Ferry Solar 1 is in West Union, Clark County, Illinois, at 39.2591° N, 87.6282° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Illinois are similar in size?
Illinois has 406 operable solar plants with 4,387 MW of capacity, and River Ferry Solar 1's 165 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Emily Solar, LLC | Cumberland | 274 | 40,846 |
| Maple Flats | Clay | 250 | 493,105 |
| Prairie Wolf Solar LLC | Coles | 200 | 379,636 |
| River Ferry Solar 1 | Clark | 165 | 304,116 |
| Eldorado Solar I | Saline | 150 | 308,348 |
| Boomtown Renewable Energy Center | White | 150 | 286,304 |
| Cass County Renewable Energy Center | Cass | 150 | 331,772 |
Source: EIA Forms EIA-860 and EIA-923, 2025.