Faraday is a 37.2 MW hydro power plant in Clackamas County, Oregon, operated by Portland General Electric Co, and it generated 133,129 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Oregon, and its capacity factor sits at the 57th percentile of U.S. hydro plants. By 2025 generation it ranks 3,084th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

37.2 MWNameplate capacity
36%Capacity factor, 2025, 57th percentile, on 41.9 MW net summer
0.2%Of OR generation, 2025
36 yearsAverage generator age, by MW

How hard does the Faraday plant run compared with other hydro plants?

The Faraday plant had a capacity factor of 36% in 2025 on 41.9 MW of net summer capacity, the 57th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 132 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Faraday36%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Faraday plant generating more or less than last year?

Generation at Faraday rose 11.0% from 2024 to 2025, from 119,883 MWh to 133,129 MWh.

Net generation by period
PeriodMWh
2024119,883
2025133,129
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202520,893
November 20259,733
October 20254,941
September 20253,055
August 20252,773
July 20253,437
June 20254,743
May 20259,894
April 202519,754
March 202521,296
February 202513,974
January 202518,636
December 202420,025
November 202414,098
October 20243,689
September 20243,268
August 20243,370
July 20244,048
June 20249,343
May 202412,951
April 202412,540
March 202412,091
February 202411,783
January 202412,677

Source: EIA Form EIA-923, through August 2026.

How much of Oregon's electricity comes from the Faraday plant?

Faraday made 0.2% of the 64,124,656 MWh reported by Oregon plants in 2025, from 0.2% of the state's 19,040 MW of capacity. By capacity it is the 66th largest of 302 plants in Oregon, the 4,190th largest of 14,327 in the U.S. and the 331st largest of 1,393 hydro plants. By 2025 generation it is the 57th largest of 278 generating plants in the state.

Faraday within Oregon, 2025
MeasureThis plantOregonShare
Capacity (MW)3719,0400.2%
Generation (MWh)133,12964,124,6560.2%
Hydro capacity (MW)378,3600.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Faraday plant, and when do they retire?

3 operable generators total 37.2 MW, with an average age of 36 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 5 have already retired, totalling 17.4 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s11952%none reported
2020s21848%none reported
Every generator, 8 in all
UnitStatusTechnologyMWIn servicePlanned retirement
6OperatingConventional Hydroelectric191958n/a
7OperatingConventional Hydroelectric92023n/a
8OperatingConventional Hydroelectric92023n/a
1RetiredConventional Hydroelectric319072019
2RetiredConventional Hydroelectric319072019
3RetiredConventional Hydroelectric319082019
4RetiredConventional Hydroelectric519092019
5RetiredConventional Hydroelectric419102019

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Faraday plant?

EIA lists no joint owners for Faraday. Portland General Electric Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Portland General Electric Co charge homes?

Portland General Electric Co, the operator of Faraday, had an average residential price of 18.79¢ per kWh and an average bill of $142 a month in 2025, 22% above the Oregon average of 15.46¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Oregon
Portland General Electric Co18.79¢$14222% higher
Oregon average15.46¢$134
U.S. average17.23¢$15111% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Faraday plant?

Faraday is in Estacada, Clackamas County, Oregon, at 45.2680° N, 122.3201° W. It sits in the Portland General Electric Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Oregon are similar in size?

Oregon has 63 operable hydro plants with 8,360 MW of capacity, and Faraday's 37.2 MW is 0% of that.

Hydro plants in Oregon around this size
PlantCountyMW2025 MWh
Lemolo 2Douglas44149,510
Toketee FallsDouglas43208,430
North ForkClackamas41163,973
FaradayClackamas37133,129
Lemolo 1Douglas32120,111
Prospect 2Jackson32180,089
Hills CreekLane30115,870

Source: EIA Forms EIA-860 and EIA-923, 2025.