Hydro power plant, Oregon
Lemolo 2 hydroelectric power plant, Oregon
Lemolo 2 is a 43.7 MW hydro power plant in Douglas County, Oregon, operated by PacifiCorp, and it generated 149,510 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Oregon, and its capacity factor sits at the 77th percentile of U.S. hydro plants. By 2025 generation it ranks 2,908th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Lemolo 2 plant run compared with other hydro plants?
The Lemolo 2 plant had a capacity factor of 44% in 2025 on 38.5 MW of net summer capacity, the 77th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 162 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Lemolo 2 | 44% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Lemolo 2 plant generating more or less than last year?
Lemolo 2 generated 149,510 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 10 months, so the two years are not compared.
2 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 62,699 |
| 2025 | 149,510 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 12,389 |
| November 2025 | 10,702 |
| October 2025 | 12,355 |
| September 2025 | 11,776 |
| August 2025 | 10,063 |
| July 2025 | 10,506 |
| June 2025 | 16,143 |
| May 2025 | 19,727 |
| April 2025 | 18,463 |
| March 2025 | 14,713 |
| February 2025 | 12,578 |
| January 2025 | 95 |
| December 2024 | -6 |
| November 2024 | -48 |
| October 2024 | 7 |
| September 2024 | 5,913 |
| August 2024 | 6,247 |
| July 2024 | 6,068 |
| June 2024 | 5,978 |
| May 2024 | 6,488 |
| April 2024 | 6,068 |
| March 2024 | 6,748 |
| February 2024 | 9,797 |
| January 2024 | 9,439 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Lemolo 2 plant, and when do they retire?
1 operable generator totals 43.7 MW, with an average age of 69 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1950s | 1 | 44 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Conventional Hydroelectric | 44 | 1956 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Lemolo 2 plant?
EIA lists no joint owners for Lemolo 2. PacifiCorp operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does PacifiCorp charge homes?
PacifiCorp, the operator of Lemolo 2, had an average residential price of 15.18¢ per kWh and an average bill of $133 a month in 2025, 2% below the Oregon average of 15.46¢.
| Measure | Price | Monthly bill | Against Oregon |
|---|---|---|---|
| PacifiCorp | 15.18¢ | $133 | 2% lower |
| Oregon average | 15.46¢ | $134 | |
| U.S. average | 17.23¢ | $151 | 11% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Lemolo 2 plant?
Lemolo 2 is in Toketee Falls, Douglas County, Oregon, at 43.2806° N, 122.4025° W. It sits in the PacifiCorp - West balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Oregon are similar in size?
Oregon has 63 operable hydro plants with 8,360 MW of capacity, and Lemolo 2's 43.7 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Green Peter | Linn | 80 | 115,585 |
| Oak Grove | Clackamas | 51 | 142,123 |
| Lost Creek | Jackson | 49 | 221,266 |
| Lemolo 2 | Douglas | 44 | 149,510 |
| Toketee Falls | Douglas | 43 | 208,430 |
| North Fork | Clackamas | 41 | 163,973 |
| Faraday | Clackamas | 37 | 133,129 |
Source: EIA Forms EIA-860 and EIA-923, 2025.