Hydro power plant, Oregon
Lost Creek hydroelectric power plant, Oregon
Lost Creek is a 49 MW hydro power plant in Jackson County, Oregon, operated by USACE Northwestern Division, and it generated 221,266 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Oregon, and its capacity factor sits at the 88th percentile of U.S. hydro plants. By 2025 generation it ranks 2,356th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Lost Creek plant run compared with other hydro plants?
The Lost Creek plant had a capacity factor of 52% in 2025 on 49 MW of net summer capacity, the 88th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 188 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Lost Creek | 52% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Lost Creek plant generating more or less than last year?
Generation at Lost Creek fell 23.5% from 2024 to 2025, from 289,101 MWh to 221,266 MWh.
| Period | MWh |
|---|---|
| 2024 | 289,101 |
| 2025 | 221,266 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 15,907 |
| November 2025 | 15,367 |
| October 2025 | 15,919 |
| September 2025 | 20,087 |
| August 2025 | 20,148 |
| July 2025 | 18,729 |
| June 2025 | 18,661 |
| May 2025 | 19,240 |
| April 2025 | 18,620 |
| March 2025 | 18,990 |
| February 2025 | 15,193 |
| January 2025 | 24,405 |
| December 2024 | 22,652 |
| November 2024 | 15,062 |
| October 2024 | 13,225 |
| September 2024 | 18,524 |
| August 2024 | 26,283 |
| July 2024 | 26,973 |
| June 2024 | 35,505 |
| May 2024 | 37,175 |
| April 2024 | 29,707 |
| March 2024 | 22,150 |
| February 2024 | 20,003 |
| January 2024 | 21,842 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Lost Creek plant, and when do they retire?
2 operable generators total 49 MW, with an average age of 48 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1970s | 2 | 49 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Conventional Hydroelectric | 25 | 1977 | n/a |
| 2 | Operating | Conventional Hydroelectric | 25 | 1977 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Lost Creek plant?
EIA lists no joint owners for Lost Creek. USACE Northwestern Division operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Lost Creek plant?
Lost Creek is in Trail, Jackson County, Oregon, at 42.6717° N, 122.6772° W. It sits in the PacifiCorp - West balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Oregon are similar in size?
Oregon has 63 operable hydro plants with 8,360 MW of capacity, and Lost Creek's 49 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Green Peter | Linn | 80 | 115,585 |
| Oak Grove | Clackamas | 51 | 142,123 |
| Lost Creek | Jackson | 49 | 221,266 |
| Lemolo 2 | Douglas | 44 | 149,510 |
| Toketee Falls | Douglas | 43 | 208,430 |
| North Fork | Clackamas | 41 | 163,973 |
Source: EIA Forms EIA-860 and EIA-923, 2025.