Skip to main content
RateWatt

Solar power plant, Minnesota

Fillmore County Solar Project, Minnesota

Fillmore County Solar Project is a 45 MW solar power plant in Fillmore County, Minnesota, operated by Geronimo Power, and it generated 82,970 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Minnesota, and its capacity factor sits at the 33rd percentile of U.S. solar plants. By 2025 generation it ranks 3,607th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

45 MWNameplate capacity
21%Capacity factor, 2025, 33rd percentile, on 45 MW net summer
0.1%Of MN generation, 2025
1 yearAverage generator age, by MW

How hard does the Fillmore County Solar Project plant run compared with other solar plants?

The Fillmore County Solar Project plant had a capacity factor of 21% in 2025 on 45 MW of net summer capacity, the 33rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 77 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Fillmore County Solar Project21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Fillmore County Solar Project plant generating more or less than last year?

Fillmore County Solar Project generated 82,970 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 3.1% behind the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.

Net generation by period
PeriodMWh
20241,957
202582,970
2026 through August63,320
2025, same months65,312
Monthly generation, Dec 2024 to Aug 2026
MonthMWh
August 20269,348
July 202611,261
June 202610,423
May 20269,926
April 20266,365
March 20267,047
February 20265,027
January 20263,923
December 20252,452
November 20253,351
October 20253,478
September 20258,377
August 20259,903
July 202511,541
June 20259,205
May 202510,518
April 20257,203
March 20258,021
February 20255,100
January 20253,821
December 20241,957

Source: EIA Form EIA-923, through August 2026.

How much of Minnesota's electricity comes from the Fillmore County Solar Project plant?

Fillmore County Solar Project made 0.1% of the 58,638,010 MWh reported by Minnesota plants in 2025, from 0.2% of the state's 19,860 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 71st largest of 804 plants in Minnesota, the 3,971st largest of 14,327 in the U.S. and the 949th largest of 7,223 solar plants. By 2025 generation it is the 72nd largest of 760 generating plants in the state.

Fillmore County Solar Project within Minnesota, 2025
MeasureThis plantMinnesotaShare
Capacity (MW)4519,8600.2%
Generation (MWh)82,97058,638,0100.1%
Solar capacity (MW)451,8742.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Fillmore County Solar Project plant, and when do they retire?

1 operable generator totals 45 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s145100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
FILCOOperatingSolar Photovoltaic452024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Fillmore County Solar Project plant?

EIA lists no joint owners for Fillmore County Solar Project. Geronimo Power operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Fillmore County Solar Project plant?

Fillmore County Solar Project is in Spring Valley, Fillmore County, Minnesota, at 43.5520° N, 92.3570° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Minnesota are similar in size?

Minnesota has 540 operable solar plants with 1,874 MW of capacity, and Fillmore County Solar Project's 45 MW is 2% of that.

Solar plants in Minnesota around this size
PlantCountyMW2025 MWh
Marshall Solar Energy ProjectLyon6296,573
Louise SolarMower5092,905
Hoot Lake SolarOtter Tail5073,298
Fillmore County Solar ProjectFillmore4582,970

Source: EIA Forms EIA-860 and EIA-923, 2025.