Solar power plant, Minnesota
Louise Solar power plant, Minnesota
Louise Solar is a 50 MW solar power plant in Mower County, Minnesota, operated by Geronimo Power, and it generated 92,905 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Minnesota, and its capacity factor sits at the 34th percentile of U.S. solar plants. By 2025 generation it ranks 3,477th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Louise Solar plant run compared with other solar plants?
The Louise Solar plant had a capacity factor of 21% in 2025 on 50 MW of net summer capacity, the 34th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 77 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Louise Solar | 21% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Louise Solar plant generating more or less than last year?
Louise Solar generated 92,905 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 2.2% behind the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 2,395 |
| 2025 | 92,905 |
| 2026 through August | 69,397 |
| 2025, same months | 70,957 |
Monthly generation, Dec 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 10,760 |
| July 2026 | 13,082 |
| June 2026 | 11,403 |
| May 2026 | 10,691 |
| April 2026 | 6,798 |
| March 2026 | 7,200 |
| February 2026 | 5,302 |
| January 2026 | 4,161 |
| December 2025 | 2,646 |
| November 2025 | 3,634 |
| October 2025 | 6,470 |
| September 2025 | 9,198 |
| August 2025 | 11,019 |
| July 2025 | 13,157 |
| June 2025 | 10,361 |
| May 2025 | 11,022 |
| April 2025 | 7,671 |
| March 2025 | 8,021 |
| February 2025 | 5,282 |
| January 2025 | 4,424 |
| December 2024 | 2,395 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Louise Solar plant, and when do they retire?
1 operable generator totals 50 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 50 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| LSSLR | Operating | Solar Photovoltaic | 50 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Louise Solar plant?
EIA lists no joint owners for Louise Solar. Geronimo Power operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Louise Solar plant?
Louise Solar is in Taopi, Mower County, Minnesota, at 43.5620° N, 92.6830° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Minnesota are similar in size?
Minnesota has 540 operable solar plants with 1,874 MW of capacity, and Louise Solar's 50 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| North Star Solar Project | Chisago | 100 | 181,201 |
| Marshall Solar Energy Project | Lyon | 62 | 96,573 |
| Louise Solar | Mower | 50 | 92,905 |
| Hoot Lake Solar | Otter Tail | 50 | 73,298 |
| Fillmore County Solar Project | Fillmore | 45 | 82,970 |
Source: EIA Forms EIA-860 and EIA-923, 2025.