Solar power plant, Minnesota

North Star Solar Project, Minnesota

North Star Solar Project is a 100 MW solar power plant in Chisago County, Minnesota, operated by North Star Solar PV LLC, and it generated 181,201 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Minnesota, and its capacity factor sits at the 30th percentile of U.S. solar plants. By 2025 generation it ranks 2,632nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
21%Capacity factor, 2025, 30th percentile, on 100 MW net summer
0.3%Of MN generation, 2025
9 yearsAverage generator age, by MW

How hard does the North Star Solar Project plant run compared with other solar plants?

The North Star Solar Project plant had a capacity factor of 21% in 2025 on 100 MW of net summer capacity, the 30th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 76 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
North Star Solar Project21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the North Star Solar Project plant generating more or less than last year?

Generation at North Star Solar Project fell 3.3% from 2024 to 2025, from 187,421 MWh to 181,201 MWh. Through August 2026 it is running 1.9% behind the same months of 2025.

Net generation by period
PeriodMWh
2024187,421
2025181,201
2026 through August139,687
2025, same months142,416
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202622,294
July 202625,407
June 202620,196
May 202623,175
April 202615,337
March 202616,003
February 202610,891
January 20266,384
December 20253,676
November 20257,025
October 202512,103
September 202515,981
August 202519,815
July 202525,501
June 202519,543
May 202524,150
April 202518,905
March 202516,345
February 202510,423
January 20257,734
December 20243,312
November 20245,502
October 202413,817
September 202420,881
August 202420,890
July 202424,842
June 202421,570
May 202423,268
April 202416,804
March 202418,340
February 202413,075
January 20245,120

Source: EIA Form EIA-923, through August 2026.

How much of Minnesota's electricity comes from the North Star Solar Project plant?

North Star Solar Project made 0.3% of the 58,638,010 MWh reported by Minnesota plants in 2025, from 0.5% of the state's 19,860 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 46th largest of 804 plants in Minnesota, the 2,602nd largest of 14,327 in the U.S. and the 432nd largest of 7,223 solar plants. By 2025 generation it is the 48th largest of 760 generating plants in the state.

North Star Solar Project within Minnesota, 2025
MeasureThis plantMinnesotaShare
Capacity (MW)10019,8600.5%
Generation (MWh)181,20158,638,0100.3%
Solar capacity (MW)1001,8745.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the North Star Solar Project plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
NSSP1OperatingSolar Photovoltaic1002016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the North Star Solar Project plant?

EIA lists no joint owners for North Star Solar Project. North Star Solar PV LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the North Star Solar Project plant?

North Star Solar Project is in North Branch, Chisago County, Minnesota, at 45.4700° N, 92.9100° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Minnesota are similar in size?

Minnesota has 540 operable solar plants with 1,874 MW of capacity, and North Star Solar Project's 100 MW is 5% of that.

Solar plants in Minnesota around this size
PlantCountyMW2025 MWh
North Star Solar ProjectChisago100181,201
Marshall Solar Energy ProjectLyon6296,573
Louise SolarMower5092,905

Source: EIA Forms EIA-860 and EIA-923, 2025.