Solar power plant, Minnesota
Marshall Solar Energy Project, Minnesota
Marshall Solar Energy Project is a 62.3 MW solar power plant in Lyon County, Minnesota, operated by Marshall Solar Energy Project, and it generated 96,573 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Minnesota, and its capacity factor sits at the 16th percentile of U.S. solar plants. By 2025 generation it ranks 3,437th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Marshall Solar Energy Project plant run compared with other solar plants?
The Marshall Solar Energy Project plant had a capacity factor of 18% in 2025 on 62.3 MW of net summer capacity, the 16th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 65 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Marshall Solar Energy Project | 18% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Marshall Solar Energy Project plant generating more or less than last year?
Generation at Marshall Solar Energy Project rose 10.5% from 2024 to 2025, from 87,422 MWh to 96,573 MWh. Through August 2026 it is running 2.0% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 87,422 |
| 2025 | 96,573 |
| 2026 through August | 75,152 |
| 2025, same months | 73,647 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 12,217 |
| July 2026 | 12,810 |
| June 2026 | 12,026 |
| May 2026 | 11,047 |
| April 2026 | 7,159 |
| March 2026 | 8,186 |
| February 2026 | 6,961 |
| January 2026 | 4,746 |
| December 2025 | 2,963 |
| November 2025 | 4,821 |
| October 2025 | 5,725 |
| September 2025 | 9,417 |
| August 2025 | 10,897 |
| July 2025 | 12,853 |
| June 2025 | 7,690 |
| May 2025 | 11,845 |
| April 2025 | 9,553 |
| March 2025 | 9,007 |
| February 2025 | 6,102 |
| January 2025 | 5,700 |
| December 2024 | 2,655 |
| November 2024 | 3,860 |
| October 2024 | 6,817 |
| September 2024 | 9,560 |
| August 2024 | 11,137 |
| July 2024 | 9,918 |
| June 2024 | 9,752 |
| May 2024 | 10,676 |
| April 2024 | 5,189 |
| March 2024 | 8,408 |
| February 2024 | 6,653 |
| January 2024 | 2,797 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Marshall Solar Energy Project plant, and when do they retire?
1 operable generator totals 62.3 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 62 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PV1 | Operating | Solar Photovoltaic | 62 | 2017 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Marshall Solar Energy Project plant?
EIA lists no joint owners for Marshall Solar Energy Project. Marshall Solar Energy Project operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Marshall Solar Energy Project plant?
Marshall Solar Energy Project is in Marshall, Lyon County, Minnesota, at 44.4753° N, 95.6690° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Minnesota are similar in size?
Minnesota has 540 operable solar plants with 1,874 MW of capacity, and Marshall Solar Energy Project's 62.3 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| North Star Solar Project | Chisago | 100 | 181,201 |
| Marshall Solar Energy Project | Lyon | 62 | 96,573 |
| Louise Solar | Mower | 50 | 92,905 |
| Hoot Lake Solar | Otter Tail | 50 | 73,298 |
| Fillmore County Solar Project | Fillmore | 45 | 82,970 |
Source: EIA Forms EIA-860 and EIA-923, 2025.