Fort Detrick Solar PV power plant, Maryland

Fort Detrick Solar PV is a 21.7 MW power plant, 15.7 MW of it solar, in Frederick County, Maryland, operated by Montevue Lane Solar, LLC, and it generated 19,721 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Maryland, and its capacity factor sits at the 12th percentile of U.S. solar plants. By 2025 generation it ranks 5,273rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

21.7 MWNameplate capacity
15%Capacity factor, 2025, solar units, 12th percentile, on 15.7 MW net summer
0.1%Of MD generation, 2025
7 yearsAverage generator age, by MW

How hard does the Fort Detrick Solar PV plant run compared with other solar plants?

The Fort Detrick Solar PV plant's solar units had a capacity factor of 15% in 2025 on 15.7 MW of net summer capacity, the 12th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 55 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Fort Detrick Solar PV15%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Fort Detrick Solar PV plant generating more or less than last year?

Generation at Fort Detrick Solar PV fell 4.1% from 2024 to 2025, from 20,558 MWh to 19,721 MWh.

Net generation by period
PeriodMWh
202420,558
202519,721
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025771
November 20251,158
October 20251,757
September 20251,756
August 20252,042
July 20252,253
June 20252,119
May 20252,049
April 20251,954
March 20251,883
February 20251,298
January 2025681
December 2024740
November 20241,229
October 20241,916
September 20241,591
August 20242,064
July 20242,351
June 20242,568
May 20241,982
April 20242,003
March 20242,001
February 20241,497
January 2024616

Source: EIA Form EIA-923, through August 2026.

How much of Maryland's electricity comes from the Fort Detrick Solar PV plant?

Fort Detrick Solar PV made 0.1% of the 37,475,103 MWh reported by Maryland plants in 2025, from 0.2% of the state's 13,377 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 38th largest of 236 plants in Maryland, the 4,713th largest of 14,327 in the U.S. and the 1,374th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 37th largest of 226 generating plants in the state.

Fort Detrick Solar PV within Maryland, 2025
MeasureThis plantMarylandShare
Capacity (MW)2213,3770.2%
Generation (MWh)19,72137,475,1030.1%
Solar capacity (MW)161,1451.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Fort Detrick Solar PV plant, and when do they retire?

2 operable generators total 21.7 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s11672%none reported
2020s1628%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
FDSPVOperatingSolar Photovoltaic162016n/a
FDSBSOperatingBatteries62024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Fort Detrick Solar PV plant?

EIA lists no joint owners for Fort Detrick Solar PV. Montevue Lane Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Fort Detrick Solar PV plant use?

Fort Detrick Solar PV has capacity on 2 fuels: 72% solar and 28% battery and pumped storage. In 2025, solar made 104% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar1672.4%20,600
Battery and pumped storage627.6%-879

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Fort Detrick Solar PV plant?

Fort Detrick Solar PV is in Frederick, Frederick County, Maryland, at 39.4400° N, 77.4500° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Maryland are similar in size?

Maryland has 188 operable solar plants with 1,145 MW of capacity, and Fort Detrick Solar PV's 15.7 MW is 1% of that.

Solar plants in Maryland around this size
PlantCountyMW2025 MWh
LeGore Bridge Solar CenterFrederick203,098
Todd SolarDorchester2031,500
Jade Meadow LLCAllegany2032,065
Fort Detrick Solar PVFrederick1620,600
Biggs Ford Solar CenterFrederick1510,073
Mount Saint Mary'sFrederick1416,378
Longview SolarWicomico1422,473