Solar power plant, Maryland
Fort Detrick Solar PV power plant, Maryland
Fort Detrick Solar PV is a 21.7 MW power plant, 15.7 MW of it solar, in Frederick County, Maryland, operated by Montevue Lane Solar, LLC, and it generated 19,721 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Maryland, and its capacity factor sits at the 12th percentile of U.S. solar plants. By 2025 generation it ranks 5,273rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Fort Detrick Solar PV plant run compared with other solar plants?
The Fort Detrick Solar PV plant's solar units had a capacity factor of 15% in 2025 on 15.7 MW of net summer capacity, the 12th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 55 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Fort Detrick Solar PV | 15% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Fort Detrick Solar PV plant generating more or less than last year?
Generation at Fort Detrick Solar PV fell 4.1% from 2024 to 2025, from 20,558 MWh to 19,721 MWh.
| Period | MWh |
|---|---|
| 2024 | 20,558 |
| 2025 | 19,721 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 771 |
| November 2025 | 1,158 |
| October 2025 | 1,757 |
| September 2025 | 1,756 |
| August 2025 | 2,042 |
| July 2025 | 2,253 |
| June 2025 | 2,119 |
| May 2025 | 2,049 |
| April 2025 | 1,954 |
| March 2025 | 1,883 |
| February 2025 | 1,298 |
| January 2025 | 681 |
| December 2024 | 740 |
| November 2024 | 1,229 |
| October 2024 | 1,916 |
| September 2024 | 1,591 |
| August 2024 | 2,064 |
| July 2024 | 2,351 |
| June 2024 | 2,568 |
| May 2024 | 1,982 |
| April 2024 | 2,003 |
| March 2024 | 2,001 |
| February 2024 | 1,497 |
| January 2024 | 616 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Fort Detrick Solar PV plant, and when do they retire?
2 operable generators total 21.7 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 16 | 72% | none reported |
| 2020s | 1 | 6 | 28% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| FDSPV | Operating | Solar Photovoltaic | 16 | 2016 | n/a |
| FDSBS | Operating | Batteries | 6 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Fort Detrick Solar PV plant?
EIA lists no joint owners for Fort Detrick Solar PV. Montevue Lane Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Fort Detrick Solar PV plant use?
Fort Detrick Solar PV has capacity on 2 fuels: 72% solar and 28% battery and pumped storage. In 2025, solar made 104% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 16 | 72.4% | 20,600 |
| Battery and pumped storage | 6 | 27.6% | -879 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Fort Detrick Solar PV plant?
Fort Detrick Solar PV is in Frederick, Frederick County, Maryland, at 39.4400° N, 77.4500° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Maryland are similar in size?
Maryland has 188 operable solar plants with 1,145 MW of capacity, and Fort Detrick Solar PV's 15.7 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| LeGore Bridge Solar Center | Frederick | 20 | 3,098 |
| Todd Solar | Dorchester | 20 | 31,500 |
| Jade Meadow LLC | Allegany | 20 | 32,065 |
| Fort Detrick Solar PV | Frederick | 16 | 20,600 |
| Biggs Ford Solar Center | Frederick | 15 | 10,073 |
| Mount Saint Mary's | Frederick | 14 | 16,378 |
| Longview Solar | Wicomico | 14 | 22,473 |
Source: EIA Forms EIA-860 and EIA-923, 2025.