Solar power plant, Maryland
Todd Solar power plant, Maryland
Todd Solar is a 20 MW solar power plant in Dorchester County, Maryland, operated by Invenergy Services LLC, and it generated 31,500 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Maryland, and its capacity factor sits at the 17th percentile of U.S. solar plants. By 2025 generation it ranks 4,682nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Todd Solar plant run compared with other solar plants?
The Todd Solar plant had a capacity factor of 18% in 2025 on 20 MW of net summer capacity, the 17th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 66 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Todd Solar | 18% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Todd Solar plant generating more or less than last year?
Generation at Todd Solar fell 7.1% from 2024 to 2025, from 33,921 MWh to 31,500 MWh.
| Period | MWh |
|---|---|
| 2024 | 33,921 |
| 2025 | 31,500 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,397 |
| November 2025 | 1,990 |
| October 2025 | 3,312 |
| September 2025 | 3,186 |
| August 2025 | 3,397 |
| July 2025 | 3,288 |
| June 2025 | 1,820 |
| May 2025 | 2,497 |
| April 2025 | 3,733 |
| March 2025 | 3,408 |
| February 2025 | 1,939 |
| January 2025 | 1,533 |
| December 2024 | 1,564 |
| November 2024 | 1,978 |
| October 2024 | 2,936 |
| September 2024 | 2,171 |
| August 2024 | 3,015 |
| July 2024 | 2,499 |
| June 2024 | 4,607 |
| May 2024 | 3,108 |
| April 2024 | 4,278 |
| March 2024 | 3,848 |
| February 2024 | 2,745 |
| January 2024 | 1,172 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Todd Solar plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 65004 | Operating | Solar Photovoltaic | 20 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Todd Solar plant?
EIA lists no joint owners for Todd Solar. Invenergy Services LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Todd Solar plant?
Todd Solar is in Hurlock, Dorchester County, Maryland, at 38.6133° N, 75.8352° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Maryland are similar in size?
Maryland has 188 operable solar plants with 1,145 MW of capacity, and Todd Solar's 20 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Ripley | Charles | 28 | 44,177 |
| Maryland Solar | Washington | 27 | 26,048 |
| LeGore Bridge Solar Center | Frederick | 20 | 3,098 |
| Todd Solar | Dorchester | 20 | 31,500 |
| Jade Meadow LLC | Allegany | 20 | 32,065 |
| Fort Detrick Solar PV | Frederick | 16 | 20,600 |
| Biggs Ford Solar Center | Frederick | 15 | 10,073 |
Source: EIA Forms EIA-860 and EIA-923, 2025.