Solar power plant, Maryland
LeGore Bridge Solar Center, Maryland
LeGore Bridge Solar Center is a 20 MW solar power plant in Frederick County, Maryland, operated by LeGore Bridge Solar Center, LLC, and it generated 3,098 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 3rd percentile of U.S. solar plants. By 2025 generation it ranks 9,612th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the LeGore Bridge Solar Center plant run compared with other solar plants?
The LeGore Bridge Solar Center plant had a capacity factor of 2% in 2025 on 20 MW of net summer capacity, the 3rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 6 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| LeGore Bridge Solar Center | 2% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the LeGore Bridge Solar Center plant generating more or less than last year?
LeGore Bridge Solar Center generated 3,098 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 3,098 |
Monthly generation, Jan 2025 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,217 |
| November 2025 | 1,778 |
| October 2025 | 103 |
| September 2025 | 0 |
| August 2025 | 0 |
| July 2025 | 0 |
| June 2025 | 0 |
| May 2025 | 0 |
| April 2025 | 0 |
| March 2025 | 0 |
| February 2025 | 0 |
| January 2025 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the LeGore Bridge Solar Center plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| LGBSC | Operating | Solar Photovoltaic | 20 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the LeGore Bridge Solar Center plant?
EIA lists no joint owners for LeGore Bridge Solar Center. LeGore Bridge Solar Center, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the LeGore Bridge Solar Center plant?
LeGore Bridge Solar Center is in Keymar, Frederick County, Maryland, at 39.5724° N, 77.3079° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Maryland are similar in size?
Maryland has 188 operable solar plants with 1,145 MW of capacity, and LeGore Bridge Solar Center's 20 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Fairview Farms | Harford | 30 | 23,900 |
| Ripley | Charles | 28 | 44,177 |
| Maryland Solar | Washington | 27 | 26,048 |
| LeGore Bridge Solar Center | Frederick | 20 | 3,098 |
| Todd Solar | Dorchester | 20 | 31,500 |
| Jade Meadow LLC | Allegany | 20 | 32,065 |
| Fort Detrick Solar PV | Frederick | 16 | 20,600 |
Source: EIA Forms EIA-860 and EIA-923, 2025.