Gila River Power Block 2 is a 619 MW natural gas power plant in Maricopa County, Arizona, operated by Salt River Project, and it generated 2,890,336 MWh in 2025 (Forms EIA-860 and EIA-923). That is 2.5% of the generation reported in Arizona, and its capacity factor sits at the 76th percentile of U.S. natural gas plants. By 2025 generation it ranks 406th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

619 MWNameplate capacity
58%Capacity factor, 2025, 76th percentile, on 570 MW net summer
2.5%Of AZ generation, 2025
22 yearsAverage generator age, by MW

How hard does the Gila River Power Block 2 plant run compared with other natural gas plants?

The Gila River Power Block 2 plant had a capacity factor of 58% in 2025 on 570 MW of net summer capacity, the 76th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 211 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Gila River Power Block 258%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Gila River Power Block 2 plant generating more or less than last year?

Generation at Gila River Power Block 2 fell 10.8% from 2024 to 2025, from 3,241,057 MWh to 2,890,336 MWh. Through August 2026 it is running 25.5% behind the same months of 2025.

Net generation by period
PeriodMWh
20243,241,057
20252,890,336
2026 through August1,485,358
2025, same months1,994,496
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026329,503
July 2026317,740
June 2026286,268
May 2026211,067
April 2026138,990
March 2026147,296
February 20261,554
January 202652,940
December 2025173,258
November 202598,453
October 2025314,481
September 2025309,648
August 2025318,117
July 2025322,186
June 2025284,327
May 2025131,225
April 2025204,978
March 2025199,198
February 2025240,485
January 2025293,980
December 2024124,156
November 2024214,751
October 2024330,504
September 2024326,291
August 2024341,685
July 2024326,304
June 2024278,176
May 2024250,190
April 2024258,464
March 2024287,190
February 2024190,548
January 2024312,798

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Gila River Power Block 2 plant?

Gila River Power Block 2 made 2.5% of the 115,800,378 MWh reported by Arizona plants in 2025, from 1.5% of the state's 40,514 MW of capacity. Its share of output is 1.6 times its share of capacity. By capacity it is the 22nd largest of 191 plants in Arizona, the 577th largest of 14,327 in the U.S. and the 354th largest of 1,962 natural gas plants. By 2025 generation it is the 13th largest of 167 generating plants in the state.

Gila River Power Block 2 within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)61940,5141.5%
Generation (MWh)2,890,336115,800,3782.5%
Natural gas capacity (MW)61917,3863.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Gila River Power Block 2 plant, and when do they retire?

3 operable generators total 619 MW, with an average age of 22 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s3619100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CTG3OperatingNatural Gas Fired Combined Cycle1742003n/a
CTG4OperatingNatural Gas Fired Combined Cycle1742003n/a
ST10OperatingNatural Gas Fired Combined Cycle2712003n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Gila River Power Block 2 plant?

Tucson Electric Power Co is the only joint owner reported for Gila River Power Block 2, with 100.0%. Salt River Project operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Salt River Project charge homes?

Salt River Project, the operator of Gila River Power Block 2, had an average residential price of 13.98¢ per kWh and an average bill of $160 a month in 2025, 8% below the Arizona average of 15.26¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Arizona
Salt River Project13.98¢$1608% lower
Arizona average15.26¢$157
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Gila River Power Block 2 plant?

Gila River Power Block 2 is in Gila Bend, Maricopa County, Arizona, at 32.9750° N, 112.6944° W. It sits in the Salt River Project balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Arizona are similar in size?

Arizona has 33 operable natural gas plants with 17,386 MW of capacity, and Gila River Power Block 2's 619 MW is 4% of that.

Natural gas plants in Arizona around this size
PlantCountyMW2025 MWh
Gila River Power Block 4Maricopa6192,671,230
Gila River Power Block 1Maricopa6192,561,038
Gila River Power Block 3Maricopa6192,914,173
Gila River Power Block 2Maricopa6192,890,336
KyreneMaricopa5961,008,319
Apache StationCochise5781,753,309
H Wilson Sundt Generating StationPima5291,637,517

Source: EIA Forms EIA-860 and EIA-923, 2025.