Natural gas power plant, Arizona
Gila River Power Block 3 natural gas power plant, Arizona
Gila River Power Block 3 is a 619 MW natural gas power plant in Maricopa County, Arizona, operated by Salt River Project, and it generated 2,914,173 MWh in 2025 (Forms EIA-860 and EIA-923). That is 2.5% of the generation reported in Arizona, and its capacity factor sits at the 77th percentile of U.S. natural gas plants. By 2025 generation it ranks 401st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Gila River Power Block 3 plant run compared with other natural gas plants?
The Gila River Power Block 3 plant had a capacity factor of 58% in 2025 on 570 MW of net summer capacity, the 77th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 213 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Gila River Power Block 3 | 58% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Gila River Power Block 3 plant generating more or less than last year?
Generation at Gila River Power Block 3 fell 9.1% from 2024 to 2025, from 3,204,308 MWh to 2,914,173 MWh. Through August 2026 it is running 13.0% ahead of the same months of 2025.
1 month shows net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 3,204,308 |
| 2025 | 2,914,173 |
| 2026 through August | 2,050,738 |
| 2025, same months | 1,814,124 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 337,655 |
| July 2026 | 330,607 |
| June 2026 | 276,823 |
| May 2026 | 263,799 |
| April 2026 | 236,218 |
| March 2026 | 67,972 |
| February 2026 | 275,904 |
| January 2026 | 261,760 |
| December 2025 | 215,142 |
| November 2025 | 330,352 |
| October 2025 | 249,473 |
| September 2025 | 305,082 |
| August 2025 | 321,487 |
| July 2025 | 322,018 |
| June 2025 | 289,122 |
| May 2025 | 273,080 |
| April 2025 | 225,126 |
| March 2025 | 180,521 |
| February 2025 | -578 |
| January 2025 | 203,348 |
| December 2024 | 349,216 |
| November 2024 | 305,795 |
| October 2024 | 290,762 |
| September 2024 | 212,036 |
| August 2024 | 305,929 |
| July 2024 | 325,874 |
| June 2024 | 295,211 |
| May 2024 | 223,088 |
| April 2024 | 131,583 |
| March 2024 | 260,377 |
| February 2024 | 262,437 |
| January 2024 | 242,000 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Gila River Power Block 3 plant, and when do they retire?
3 operable generators total 619 MW, with an average age of 22 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 3 | 619 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CTG5 | Operating | Natural Gas Fired Combined Cycle | 174 | 2003 | n/a |
| CTG6 | Operating | Natural Gas Fired Combined Cycle | 174 | 2003 | n/a |
| ST11 | Operating | Natural Gas Fired Combined Cycle | 271 | 2003 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Gila River Power Block 3 plant?
2 owners report shares in Gila River Power Block 3; Tucson Electric Power Co holds the largest named share, 75.0% or about 464 MW. Salt River Project operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| Tucson Electric Power Co | 75.0% | 464 | 2,185,630 |
| UNS Electric, Inc | 25.0% | 155 | 728,543 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
What does Salt River Project charge homes?
Salt River Project, the operator of Gila River Power Block 3, had an average residential price of 13.98¢ per kWh and an average bill of $160 a month in 2025, 8% below the Arizona average of 15.26¢.
| Measure | Price | Monthly bill | Against Arizona |
|---|---|---|---|
| Salt River Project | 13.98¢ | $160 | 8% lower |
| Arizona average | 15.26¢ | $157 | |
| U.S. average | 17.23¢ | $151 | 13% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Gila River Power Block 3 plant?
Gila River Power Block 3 is in Gila Bend, Maricopa County, Arizona, at 32.9750° N, 112.6944° W. It sits in the Tucson Electric Power Company balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Arizona are similar in size?
Arizona has 33 operable natural gas plants with 17,386 MW of capacity, and Gila River Power Block 3's 619 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Griffith Energy LLC | Mohave | 655 | 3,781,278 |
| Gila River Power Block 4 | Maricopa | 619 | 2,671,230 |
| Gila River Power Block 1 | Maricopa | 619 | 2,561,038 |
| Gila River Power Block 3 | Maricopa | 619 | 2,914,173 |
| Gila River Power Block 2 | Maricopa | 619 | 2,890,336 |
| Kyrene | Maricopa | 596 | 1,008,319 |
| Apache Station | Cochise | 578 | 1,753,309 |
Source: EIA Forms EIA-860 and EIA-923, 2025.