Skip to main content
RateWatt

Solar power plant, California

Golden Field Solar III, LLC power plant, California

Golden Field Solar III, LLC is a 339 MW power plant, 192 MW of it solar, in Kern County, California, operated by Golden Fields Solar III, LLC, and it generated 520,877 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 97th percentile of U.S. solar plants. By 2025 generation it ranks 1,301st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

339 MWNameplate capacity
33%Capacity factor, 2025, solar units, 97th percentile, on 192 MW net summer
0.3%Of CA generation, 2025
3 yearsAverage generator age, by MW

How hard does the Golden Field Solar III, LLC plant run compared with other solar plants?

The Golden Field Solar III, LLC plant's solar units had a capacity factor of 33% in 2025 on 192 MW of net summer capacity, the 97th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 119 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Golden Field Solar III, LLC33%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Golden Field Solar III, LLC plant generating more or less than last year?

Generation at Golden Field Solar III, LLC fell 3.3% from 2024 to 2025, from 538,475 MWh to 520,877 MWh. Through August 2026 it is running 1.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024538,475
2025520,877
2026 through August388,931
2025, same months382,515
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202649,566
July 202655,774
June 202663,217
May 202657,530
April 202647,715
March 202649,862
February 202638,035
January 202627,232
December 202523,248
November 202526,196
October 202541,846
September 202547,072
August 202557,606
July 202565,333
June 202555,832
May 202555,359
April 202551,231
March 202535,229
February 202528,586
January 202533,339
December 202428,070
November 202429,493
October 202442,538
September 202450,945
August 202454,857
July 202461,161
June 202461,592
May 202455,874
April 202452,901
March 202438,802
February 202436,345
January 202425,897

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Golden Field Solar III, LLC plant?

Golden Field Solar III, LLC made 0.3% of the 204,542,898 MWh reported by California plants in 2025, from 0.3% of the state's 107,433 MW of capacity. By capacity it is the 63rd largest of 1,877 plants in California, the 957th largest of 14,327 in the U.S. and the 201st largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 77th largest of 1,608 generating plants in the state.

Golden Field Solar III, LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)339107,4330.3%
Generation (MWh)520,877204,542,8980.3%
Solar capacity (MW)19224,6630.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Golden Field Solar III, LLC plant, and when do they retire?

2 operable generators total 339 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2339100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
RCTROperatingSolar Photovoltaic1922020n/a
RCBAOperatingBatteries1472024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Golden Field Solar III, LLC plant?

EIA lists no joint owners for Golden Field Solar III, LLC. Golden Fields Solar III, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Golden Field Solar III, LLC plant use?

Golden Field Solar III, LLC has capacity on 2 fuels: 57% solar and 43% battery and pumped storage. In 2025, solar made 105% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar19256.6%548,125
Battery and pumped storage14743.4%-27,248

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Golden Field Solar III, LLC plant?

Golden Field Solar III, LLC is in Rosamond, Kern County, California, at 34.8470° N, 118.3950° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Golden Field Solar III, LLC's 192 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Scarlet II HybridFresno200403,487
Luna ValleyFresno200134,619
Imperial Valley Solar, LLCImperial200441,675
Golden Field Solar III, LLCKern192548,125
ProximaStanislaus190485,617
RE GarlandKern185521,659
Daggett 2San Bernardino182539,807

Source: EIA Forms EIA-860 and EIA-923, 2025.